<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

Download Workover & Drilling Rig Inspection Checklist As we mentioned in the Rig Audit Article, rig inspection is an important process that shall be done from time to time. Especially, after the rig moving to a new drilling location.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

When field operators are inspecting drilling equipment, the Work-Over Rig Field Inspection Check List of Rig Equipment app helps ensure that inspectors check all oilfield equipment carefully. The easy to use drilling rig equipment inspection app covers a wide variety of items, including the drill pipe, drill string, drilling fluid, and more.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

Considering the number of Workover Rigs off contract and stacked it is now highly important that contractors have their equipment in ready to go on contract condition. Major oil companies and operating companies will require a history of  good Rig Maintenance.

This Workover Rig Maintenance program consist of a complete maintenance schedule for all the equipment listed below. Any item listed on any of the check list worksheets can be changed and edited to suite any Workover Rig and any piece of equipment. It also covers Diesel Haulers and Water Haulers if you own your own trucks. Any item can be removed or changed to suite your Workover Rig and equipment.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

Completed Maintenance DatabaseOnce the repair is competed the item is moved to the Completed Maintenance Database is the complete history of repairs carried out on the rig and this is the one that the client will want to see to verify the rig maintenance is up to date.

To edit or add additional checks to any of the checklists n Rig Maintenance, editing is done in the edit section and linked to the checklist. You can add to or edit any checklist in the editor.

If you have installed the PM Schedule all the rig equipment listed details will be linked in the Schedule which can be edited to reference any equipment due for scheduled checks as Daily, Weekly, Monthly Due or Completed maintenance

Set up the recommended service hours in the editor.Add the recommended service hours for each piece of equipmentThis section is linked to the monthly hours and the service hoursA visual warning shows if any equipment has exceeded the recommended hours At the end of the month the month hours are transferred to the monthly service hours which lists the total running hours for the month any equipment over service hours is indicated in RED Click on the cell to indicate the service has been carried out to zero the hours and start a new month’s running hours.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

Built to withstand the rigors of daily use, TMG"s casing quick puller removes drill pipe quicker and more efficiently, making pulling pipe safer, easier and faster.

Our heavy duty pipe cart make transporting pipe around the job site easy and convenient. This cart readily stands up to the rigors found on any site. The all turf tires facilitate easy rolling to and from truck to job location. Carry pipe, tooling and small equipment quickly and easily.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

Casing head (#27) is a large metal flange welded or screwed onto the top of the conductor pipe (also known as drive-pipe) or the casing and is used to bolt the surface equipment such as the blowout preventers (for well drilling) or the Christmas tree (oil well) (for well production).

Derrick (#14) is the support structure for the equipment used to lower and raise the drill string into and out of the wellbore. This consists of the sub-structure (structure below the drill floor level) and the mast.

Drill floor (#21) is the area on the rig where the tools are located to make the connections of the drill pipe, bottom hole assembly, tools and bit. It is considered the main area where work is performed.

Drill pipe (#16) is a joint of hollow tubing used to connect the surface equipment to the bottom hole assembly (BHA) and acts as a conduit for the drilling fluid. In the diagram, these are stood in the derrick vertically, usually to save time while tripping pipe.

Setback (#17) is a part of the drill floor (#21) where the stands of drill pipe are stood upright. It is typically made of a metal frame structure with large wooden beams situated within it. The wood helps to protect the end of the drill pipe.

Stand (#16) is a section of 2 or 3 joints of drill pipe connected and stood upright in the derrick. When they are pulled out of the hole, instead of laying down each joint of drill pipe, 2 or 3 joints are left connected and stood in the derrick to save time.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

Here"s how cdl is used on rig hand resumes:Learned more of forklift operation as well as extensive CDL Driving experience.Skills UsedOperation of various equipment and tools.

Here"s how h2s is used on rig hand resumes:Worked & certified around H2S Accomplishments I was acknowledged multiple times in big safety meetings for showing my awareness of safety.

Heavy equipment, also known as heavy machinery, refers to heavy-duty trucks that are specifically built to complete building works, most often earthwork activities or other major construction projects. Heavy machinery works by multiplying the amount of input force added to force exerted, allowing jobs that would otherwise take hundreds of workers and weeks of labor to be completed in a fraction of the time.

Here"s how heavy equipment is used on rig hand resumes:Remove and replace well heads, able to work safely around heavy equipment and flammables, operate machine shop tools safely.

Here"s how job safety analysis is used on rig hand resumes:Experience with safety meetings and Job Safety Analysis as per company standard and policies.

Here"s how safety meetings is used on rig hand resumes:Help co-workers repair rig, Participate in daily safety meetings to help avoid incidents, Help rig stay clean and keep drilling

Zippia allows you to choose from different easy-to-use Rig Hand templates, and provides you with expert advice. Using the templates, you can rest assured that the structure and format of your Rig Hand resume is top notch. Choose a template with the colors, fonts & text sizes that are appropriate for your industry.

Here"s how flow lines is used on rig hand resumes:Monitored issues with the well such as closed valves along the flow lines in order to prevent pressure buildup.

General maintenance is the regular check-up and repairs of machinery, buildings, and other mechanical equipment. General maintenance is performed by repair workers who are skilled to handle the day-to-day defects produced in the machinery. General maintenance aims to make sure the items remain in the best operational conditions. Usually, a set of planned activities are performed regularly by an expert to monitor the maintenance.

Here"s how general maintenance is used on rig hand resumes:Perform general maintenance of draw works, load and off-load pipe and assists in rig movement.

Here"s how swab is used on rig hand resumes:Help on Swab Rig/Fix Leaks/Hook up Wells/Roustabout/Read Meters/Keep Records of Wells/Walk Pipelines/Soap & Flow Wells/Maintain the Running of Four Compressors

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

Safety is vitally important on rigs. This app helps keep the operational integrity of land rigs compliant with regulations and standards. It is only a sample of what can be done. It helps identify dangers before they can cause serious damage. Keep records, photos and signatures of approval in one location in a connected or disconnected environment. This rig inspection checklist form can be customized to suit your rigs requirements and regulations on oil and gas rigs, workover rigs, drilling equipment checklists, and other inspection services.Try Template

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> equipment list free sample

This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.