workover rig training quotation

This course presents the basics of drilling and completion operations, plus post-completion enhancement (workovers). Participants will learn to visualize what is happening downhole, discover what can be accomplished, and learn how drilling and completion can alter reservoir performance. Learn to communicate with drilling and production personnel. No experience or prerequisites are required.

The Terra Sonic Team has over 400 combined years of experience in the manufacturing and performance of sonic drilling technology. Our world class training services are based in Marietta, Ohio and provide a hands-on experience for everyone from the beginner sonic driller to seasoned veterans. Several weeks of field training with one of our Master Sonic Drillers provide a comprehensive introduction to sonic drilling. Terra Sonic University offers Sonic Driller Training 101, a five-day course that combines classroom and in-field training. TSi Master Sonic Driller Trainers each have over 20 years of sonic drilling experience.
When you purchase a rig from Terra Sonic we become an extension of your business, a true partner in your future success. It is not enough just to teach our customers how to operate the equipment we build, but to train them on how to drill sonically and be able to harness that power in a variety of formations and applications. It is imperative that a sonic driller can safely and effectively operate and maintain equipment and execute the projects efficiently in the field. Our Master Sonic Drillers become connected with the drillers they train and are always available to consult with the field personnel on any technical challenges they face.

In this program, employees will learn how a drilling rig drills a well. They will learn about all the people it takes to run a rig and support a drilling operation. In addition, they’ll become familiar with the equipment, tools and services a rig needs to do this job. All instruction has been captured with actual oilfield workers on working drilling and production job sites. Part of the “Oilfield Safety Series.

The document applies to rotary drilling rigs, well servicing rigs, and special services as they relate to operations on location. First published in 1981, significant revisions in this edition of Recommended Practice 54 include a new section on flowback operations which is key for safe well testing, revised requirements for facility and site process hazard assessment and mitigation, and introduction of formal risk assessments as well as expanded provisions for offshore operations.

What is an offshore oil rig? An offshore oil rig also called an offshore platform, is a large structure with infrastructural facilities for drilling wells to explore, extract, store and process petroleum lying in rock formations beneath the seabed.
This Zoe’s Offshore Oil Rig training course will empower you with complete knowledge and experience to work on offshore oil rigs or oversee end-to-end operations on these facilities.
By undertaking this training course, you will add all necessary skills to your professional portfolio, which will ultimately be very helpful in securing greater and bigger job roles and opportunities for you within and outside your organisation.
The knowledge gained through this Offshore Oil Rig Training course will also help you take up roles involving training of other budding and experienced professionals in offshore activities.
the complete skill set and capabilities to undertake critical and complex roles and responsibilities at offshore oil rigs, thereby providing one with opportunities for career growth and progression
While the course content for each training course atZoe Talent Solutions is researched and created, the content undergoes minor to major customisations as per the professional experience of the training audience.
Therefore, each course undergoes thorough review and amendments, if any, to suit the intended audience. Experienced professionals from the relevant domain deliver the training using detailed and helpful audio-visual presentations for better reference.
The trainer also encourages trainee participation through group projects and assignments requiring trainees to interact with each other. Practical projects and role-plays help enhance the knowledge and experience gained through the training.
Increased potential and ability to successfully undertake higher roles and responsibilities related to overseeing end-to-end operations at offshore oil rigs
Increased awareness and understanding of universal standards and benchmarks to be followed at offshore oil rigs, thus increasing one’s potential and capabilities to handle larger responsibilities

When you purchase a drilling rig from SIMCO Drilling Equipment, you get so much more than just the equipment. Safety is of the utmost importance to the SIMCO team and they provide training on the operation, the safety features, and the maintenance requirement for every sale. But what happens when Mother Nature doesn’t cooperate?
The USDA Natural Resources Conservation Service based in Ankeny, Iowa, recently took possession of their custom-built 2800 Geotechnical Drill Rig to be used for soil sampling. Unfortunately, the rig was deliveredin the dead of winter, when poor weather and soil conditions plus an incomplete drilling crew made training difficult and ill-advised. Instead, the SIMCO Sales Team postponed the training session to accommodate the customer.
“We emphasize safety when introducing our equipment. From the NDA safety recommendations through the owner’s manual, we walk the customer through all the appropriate safety precautions as well as all the functions and features,” said Ryan Gross, Accountant and Rig Sales for SIMCO. “That’s why it’s a no-brainer for us to conduct training at a time that’s most favorable for the customer’s time and not ours.”
With the flexibility to offer training after the sale, the client, in this case, could gather rig operators and assistant operators from across the state. Coordinating a training effort for more than 10 remote employees is logistically challenging, but the SIMCO’s team made sure they were available when the client was ready. The training session was held at the SIMCO Osceola, Iowa location and took just short of 4 hours to get all operators and assistant operators acclimated to the SIMCO 2800 Drilling Rig.

Wide selection: At our production facility in China we design and develop workover rigs for service depths ranging from 1,600 m to 8,500 m (5,250 ft-27,900 ft), and workover depths from 2,000 m to 9,000 m (6,600 ft-30,000 ft) for 2 7/8″ DP.
Highly maneuverable : Highdrilling mobile drilling rigs and self-propelled workover rigs possess excellent driving properties in desert, mountain and other impassable terrains.
Reduced NPT: The mast is erected hydraulically to reduce time for rig up and increase safety. Likewise, all rig components have been designed to allow for fast assembly and disassembly.

This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.

The design of drilling rigs for the petroleum industry has remained basically unchanged for the last four decades. Today"s offshore rigs have evolved from the basic land rig concept towed offshore in the 1950"s. Factors such as deeper waters and harsher environments have increased demands for additional auxiliary equipment such as active crown mounted motion compensator, topdrive and comprehensive mechanised pipehandling equipment. Implementation additional equipment and new systems have followed an "add-on" philosophy which has resulted in concepts of monstrosity. Further development to meet today"s and future demands of versatility, such as integration of capabilities for snubbing and coiled tubing operations, will probably evolve to a stage where the "multi-functional" course could turn to the "multi-useless" curse.
A thorough review of the status, combined with the desire to be able to contribute with more optimal solutions, have lead Maritime Hydraulics to the development of the RamRig concept.
Main Objectives. Maritime Hydraulics launched the idea in 1987, whereafter a joint venture engineering study with British Petroleum Development Norway Ltd. was carried out in 1988 and 1989. The study evaluated all known rig concepts with emphasise on the aspects of hoisting and tubular handling efficiency. The main objectives of the development work were:Improve safety by reduced manning and improving working environments,
The study concluded the RamRig concept to be the most optimal of the alternatives considered. However, as it was found to be too bold and radical for its time, it was decided that the project was to be shelved. This was mainly due to the lack of field experience of important components like the control system and the large hydrostatic transmission required.
After about 5 years Saga Petroleum"s efficient exploration, "EfEx", study, re-vitalised the concept in 1994. The detailed design of a complete drilling rig for an application for deepwater exploration operations was completed by June 1995. In this study the RamRig was found to be an important enabler for developing more efficient total concepts.

Drill Rig 30 days - R 7000 BEST Training In Machinery Operators, SAFETY, Mining, Welding, BoilerMaker, and DRIVING LICENCES. We offer FREE ACCOMMODATION. We open for REGISTRATION. Excavator 10 days - R 5000 Tower crane 10 days -R 7000 Dump truck 10 Days - R 5000 Mobile crane 10 days - R 5000 TLB Training 10 days - R 3000 Dump truck 777 10 days - R 7000 Drill Rig 30 days - R 7000 Forklift 10tons 5 Days - R3000 BOILERMAKER AND WELDING Boilermaker Section 28 - R 8000 CO2 Welding - 6000 Steel…

Axis is a completion and workover company built for today’s operators, as you shift into manufacturing mode while drilling ever-longer laterals. We’re advancing both goals through our core mission: optimizing completions.
For too long, well services has lagged other oil and gas sectors in innovation. Axis is changing that with integrated, data-driven services. New, purpose-engineered equipment. And a team that unites oilfield veterans with the next generation of crews and engineers through our leading-edge training culture.

One of the most key pieces of oil drilling rig systems is the rig substructure. The first step in setting up a drill rig, setting up the rig substructure involves unloading equipment and moving it to the location where it will remain during drilling. From there, personnel must assemble, weld and level the various pieces of equipment. During this process, personnel can become injured due to a number of hazards that exist.
Are your personnel being as safe as they should be while setting up the drill rig substructure? To improve the safety of your oil drilling equipment, be sure to follow these three impossible-to-ignore tips:
First and foremost, all personnel must be properly trained in safety procedures and job hazards for setting up the rig substructure. Whether the training takes place during pre-job safety meetings or during JSA briefings, no one should be working on your drilling rig systems without undergoing safety training first.
When setting up the rig substructure, personnel should be wearing protective equipment like eye and face protection for welding, long-sleeved clothing and more. Welding, in particular, can be very dangerous work. Ensure that your workers never look directly into a welding flame.
8613371530291