schlumberger mud pump for sale
The 2,200-hp mud pump for offshore applications is a single-acting reciprocating triplex mud pump designed for high fluid flow rates, even at low operating speeds, and with a long stroke design. These features reduce the number of load reversals in critical components and increase the life of fluid end parts.
The pump’s critical components are strategically placed to make maintenance and inspection far easier and safer. The two-piece, quick-release piston rod lets you remove the piston without disturbing the liner, minimizing downtime when you’re replacing fluid parts.
The trailer is equipped with two triplex pumps and features two 10-bbl stainless steel displacement tanks used to store and measure fluids. The advanced cement control (ACC) system is used in conjunction with a 6-bbl mixing tub and a 14-bbl density-averaging tank to provide superior density control. It enables accurate mixing of lightweight slurries down to 5 lbm/galUS via solids fraction monitoring and control.
The CPF-377 has four direct-drive centrifugal pumps to mix the cement slurry, pressurize the triplex pumps, and deliver water to the unit. CemCAT cementing computer-aided treatment can be used with this pump trailer to monitor and record sensor signals at the wellsite during pumping operations.
⊙Mud pump spare parts of abroad brand:Eg. Liner, piston, valve assembly, valve seat, valve spring, valve rubber could be alternative for original with lower price.
⊙Original brand:Emsco、Gardner-Denver, National oilwell, Ideco, Brewster, Drillmec, Wirth, Ellis, Williams, OPI, Mud King, LEWCO, Halliburton, SPM, Schlumberger, Weatherford.
SDS PMS Equipment: Mud Pump Department: Mechanical Manufacturer: Gardner Denver Frequency: Annually Model: PZ-8/9 Issued: PSS Code: GA-327-32 Completed:Item Level Inspect Description
1. [M3] [ ] Insure proper work permits are obtained before performing maintenance on this equipment. 2. [M3] [ ] Insure personnel performing this maintenance is familiar with the equipment and manufacturer"s operation and maintenance manual before beginning. 3. [M2] [ ] Make arrangements with the Rig Superintendent before performing this task and insure that it will not affect the drilling operations. 4. [E2] [ ] Isolate and tag out the electric power to the mud pump. 5. [M3] [ ] Close and tag out the pump suction and discharge valves.
Condition Evaluation Particulars Equipment Description: Manufacturer Model: Serial Number PSS Code & Tag Number: Maximum Input Power Driven By: Rig Name District Date of Condition Evaluation: Cummulative Hours on Pump: Hours/Date of Last Condition Evaluation Person in Charge of Condition Evaluation
SDS PMS Equipment: Mud Pump Department: Mechanical Manufacturer: Gardner Denver Frequency: Annually Model: PZ-8/9 Issued: PSS Code: GA-327-32 Completed:Item Level Inspect Description
2. [M3] [ ] If lube oil is contaminated, drain and flush the crankcase. Clean out the settling chamber in the forward part of the power end floor. Thoroughly clean the oil troughs and the compartment in top of the crosshead guide. Clean the element in the breather cap and clean the suction screen. Refill using Shell Omala 220.or equivalent oil; 130 US gallons. 3. [M3] [ ] Drain and flush clean the chain drive case. Clean the breather element. Refill using Shell Vitrea 150 or equivalent oil 4. [M3] [ ] Remove the all bearing and crankcase covers for inspection of the following components. Insure nothing drops inside. 1. Check the safety retaining wires on all bolts including the main bearing hold down bolts, eccentric bearing retainer bolts and gear retainer bolts. Replace any broken wires after re- tightening the bolts. Refer to crankshaft assembly section for torque values. 2. Visually inspect all bearings for damage or wear while rotating pump slowly. With a feeler gauge check and record all bearing diametrical clearances. Record the condition and clearances on the Checking Form below. 3. Inspect the ring wear and oil seal condition on the left and right side main bearings. 4. Inspect all main and eccentric bearings for cracked inner & outer bearing races. Inspect the bronze bearing cages for damage or cracks. 5. Make a complete visual inspection of all components checking for looseness, wear or damage. 6. Check the main and pinion gears for condition and wear. Measure and record the backlash. 7. Check each connecting rod retaining bolts for tightness and retaining wires for proper installation. 8. Run lube oil pump and insure all nozzles are free and clear and have a good spray pattern. 5. [M3] [ ] Remove the diaphragm stuffing box and plate. Check the safety retaining wires of the extension rods insuring none broken or missing. Where wire is broken or missing inspect all bolts for crack and thread damage. Retorque to 350 - 370 ft/lbs. Re-install all safety retaining wires. 6. [M3] [ ] Renew lip oil seal and "O" rings, clean and replace plate and stuffing box. Torque bolts to 12 - 18 ft/lbs.
SDS PMS Equipment: Mud Pump Department: Mechanical Manufacturer: Gardner Denver Frequency: Annually Model: PZ-8/9 Issued: PSS Code: GA-327-32 Completed:Item Level Inspect Description
7. [M3] [ ] Remove the ispection covers for the crossheads and carry out the following ispections: 1. Check crosshead pin retainer bolt tightness using torque wrench. Torque value 210 ft/lbs. Insure all locking wire is properly installed 2. Measure the play of the bearing, roller and crosshead pin. Record the readings on the checking form below. 3. Check crosshead clearance, use a feeler gauge between crosshead and upper crosshead guide. Do not operate pump with less than 0.010" clearance. Record the clearances on the Checking Sheet below. They should be .010 - .020. 4. Inspect crosshead and guides for condition and uniform wear. Insure there are no scratches or abnormal wear on the upper or lower slide guides. 5. Check the crosshead slide to frame bolts for tightness. 6. Check the pony rod (extension rod) surface condition for damage or scratches. A deterirated surface will cause premature failures of seals. 7. Check the pony rod to crosshead bolts for correct tighness.
Misalignment can be detected by uneven wear on the pony (extension) rods. Premature liner wear will also be a result. Refer to the mud pump fluid end log book for signs of premature liner wear.
9. [M3] [ ] Check all drive chain and sprockets for wear. New chain - 20 P. = 30" Worn out chain = 30.750" Record the measurements on the Checking Sheet below. 10. [M3] [ ] Inspect and test run the chain oil pump. Overhaul and align as necessary. 11. [M3] [ ] Inspect and test run the gear oil pump. Overhaul and align as necessary. 12. [M3] [ ] Renew the oil pump filter element. 13. [M3] [ ] Inspect and test run the flushing pump. Overhaul, repack and align as necessary.
SDS PMS Equipment: Mud Pump Department: Mechanical Manufacturer: Gardner Denver Frequency: Annually Model: PZ-8/9 Issued: PSS Code: GA-327-32 Completed:Item Level Inspect Description
15. [M3] [ ] Clean breathers on chain case and gear box. 16. [M3] [ ] Restore power to unit and remove tag. 17. [M3] [ ] Check chain lube oil pressure and record ________ psi. 18. [M3] [ ] Check gear box lube oil pressure and record ________ psi. 19. [M3] [ ] Simulate electric driven gear lube oil pump failure: Record pressure_________ psi. Min 30 psi, max 40 psi. 20. [M3] [ ] Make a complete internal inspection to insure all tools and rags have been removed. Replace all covers and reconnect the pony rod clamp. Make a complete inspection around unit insuring pump condition is ready for operation.
CAUTION: Use extreme caution whenever using RTV for sealing the gaskets faces. Do not use RTV if possible. In many cases pumps have been totally ruined, when too much RTV is applied; the excess gets squeezed into the pump mixing in the oil and eventually plugging oil passages resulting in failures.
0.008 - 0.010 Okay to run untill the next annual inspection 0.011 - 0.013 Replace at the next scheduled maintenance. 0.014 - 0.016 Replace at first opportunity. 0.017 and greater Stop Pump and replace immediately.
SDS PMS Equipment: Mud Pump Department: Mechanical Manufacturer: Gardner Denver Frequency: Annually Model: PZ-8/9 Issued: PSS Code: GA-327-32 Completed:Item Level Inspect Description
SDS PMS Equipment: Mud Pump Department: Mechanical Manufacturer: Gardner Denver Frequency: Annually Model: PZ-8/9 Issued: PSS Code: GA-327-32 Completed:Item Level Inspect Description
SDS PMS Equipment: Mud Pump Department: Mechanical Manufacturer: Gardner Denver Frequency: Annually Model: PZ-8/9 Issued: PSS Code: GA-327-32 Completed:Item Level Inspect Description
SDS PMS Equipment: Mud Pump Department: Mechanical Manufacturer: Gardner Denver Frequency: Annually Model: PZ-8/9 Issued: PSS Code: GA-327-32 Completed:Item Level Inspect Description
SDS PMS Equipment: Mud Pump Department: Mechanical Manufacturer: Gardner Denver Frequency: Annually Model: PZ-8/9 Issued: PSS Code: GA-327-32 Completed:Item Level Inspect Description
Cameron International Corporation (formerly Cooper Cameron Corporation (CCC) and Cooper Oil Tool, Cameron Iron Works) though now operating under Schlumberger, is a global provider of pressure control, production, processing, and flow control systems as well as project management and aftermarket services for the oil and gas and process industries.Schlumberger (SLB) in 2016,
In November 2012, Cameron announced plans to carve out its subsea division (and receive $600million from Schlumberger) to form a 60/40 joint venture with Schlumberger"s Framo, Surveillance, Flow Assurance and Power and Controls businesses.
In June 2013, Cameron and Schlumberger announced that OneSubsea, a joint venture to manufacture and develop products, systems and services for the subsea oil and gas market, has received all required regulatory approvals. The parties will close the transaction making OneSubsea operational on June 30, 2013.
In April 2016, oilfield services company Schlumberger completed the acquisition of Cameron International for $14.8 billion, in a combination of stock and cash.