NOV 12-P-160 Mud Pump is rated at 1600 input horsepower (1193 kw) at 120 strokes per minute, with a 12-inch (304.8 mm) stroke. Multiple liner sizes allow pressures and volumes to handle circulation requirements in deep drilling applications.

Flexibility: Compact engineering provides higher efficiency in less space. The NOV 12-P-160 Triplex Mud Pump light weight and flexible design make it easily adaptable to a variety of rig configurations. This provides flexibility as drilling requirements and conditions change.

Fluid End Modules: NOV offers a choice of fluid end modules and valve covers for every P Series pump model to select the fluid end module that exactly matches drilling requirements. All pump models can be equipped with either the standard or premium forged, two-piece interchangeable fluid modules

The Oilfield Equipment related post NOV 12-P-160 Triplex Mud Pump Used [AE] is from Flowtech Energy. Looking for Oilfield Equipment including New, Used, Remanufactured and Surplus Oilfield Supply, check out our inventory or call our toll free number at 877-645-6693 for more information.

suction manifold 12p160 mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> drawings factory

Author: Robert Coull Ref: Q_8001/GJ-204-016 Drilling Rig SattiCheck By: John Guy Upgrade No 2 & No 3 Mud Pump Date: 28-NOV-2019

1. Introduction, Background and Summary This scope of work covers the upgrade required to be completed on mud pump No 2 & No 3 to increase the operational performance from 5K to 7.5K operational limits.

M991000167-ASM-001 03 05/2015 Titan BX Valve Assembly Dwg Attached Upgrading Project of Jack UpAuthor: Robert Coull Ref: Q_8001/GJ-204-016 Drilling Rig SattiCheck By: John Guy Upgrade No 2 & No 3 Mud Pump Date: 28-NOV-2019

7,500 Psi discharge manifold cross strainers 12 – 16 Weeks 1 Dual 7,500 Psi discharge manifolds (From 1st Aug) Valve seat & spring assemblies

• Disconnect & remove suction stabilizer • Disconnect & remove suction extension • Disconnect & remove suction PRV • Remove suction manifold

• Remove reset relief • Disconnect & remove reset relief / blead off line spool at pump & blead off valve. Upgrading Project of Jack UpAuthor: Robert Coull Ref: Q_8001/GJ-204-016 Drilling Rig SattiCheck By: John Guy Upgrade No 2 & No 3 Mud Pump Date: 28-NOV-2019

• Drain off pressure from pulsation dampener pre charge (relief valve side) • Remove pulsation dampener (relief valve side) • Disconnect & remove reset relief valve spool flange from strainer cross (relief valve side) • Remove cross assembly support (relief valve side) • Remove cross assembly (relief valve side) • Drain off pressure from pulsation dampener pre charge (mud pump discharge side) • Remove pulsation dampener (mud pump discharge side) • Disconnect & remove pressure gauge (mud pump discharge side) • Disconnect & remove pressure gauge spool flange from strainer cross (mud pump discharge side) • Disconnect mud pump discharge line • Remove cross assembly support (mud pump discharge side) • Remove cross assembly (mud pump discharge side)

• Remove intermediate rod & piston • Remove liner • Remove suction module • Remove discharge module

• Discharge connector/adapter installation • Discharge module installation • Suction module installation • Suction manifold • Discharge manifold 7.5K • Liner wear plate installation • Liner pilot bushing installation • Discharge spacer installation • Follow tightening procedure as per equipment manual

• Installation cross assembly • Installation of cross assembly support Upgrading Project of Jack UpAuthor: Robert Coull Ref: Q_8001/GJ-204-016 Drilling Rig SattiCheck By: John Guy Upgrade No 2 & No 3 Mud Pump Date: 28-NOV-2019

• Connect mud pump discharge line to cross assembly • Follow tightening procedure as per equipment manual • Installation of pressure gauge spool • Installation of pressure gauge (Model 6 – 10K) • Follow tightening procedure as per equipment manual (relief valve side) • Installation cross assembly (relief valve side) • Installation of cross assembly support • Follow tightening procedure as per equipment manual

• Install pulsation dampener (relief valve side) • Install pulsation dampener (mud pump discharge side) • Follow tightening procedure as per equipment manual for both pulsation dampeners • Fill pulsation dampener pre charge (CDC to provide required pre charge pressure requirement).

• Install liner • Fit liner clamp • Check alignment • Install piston to connecting rod • Fit piston clamp • Fit piston rod/piston assembly • Fit sub-rod to intermediate rod • Fit piston rod to sub rod • Fit piston clamp • Position & connect liner spray manifold

• Oil sample to be taken & sent for analyses • Power end inspection Upgrading Project of Jack UpAuthor: Robert Coull Ref: Q_8001/GJ-204-016 Drilling Rig SattiCheck By: John Guy Upgrade No 2 & No 3 Mud Pump Date: 28-NOV-2019

12. Testing and Commissioning All NDE and testing shall be as required by ABS and GOE Upgrading Project of Jack UpAuthor: Robert Coull Ref: Q_8001/GJ-204-016 Drilling Rig SattiCheck By: John Guy Upgrade No 2 & No 3 Mud Pump Date: 28-NOV-2019