<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> derrick made in china

This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> derrick made in china

This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> derrick made in china

Main Features Name: traveling hook Brand: KH Original: China Domestic famous fluid end, strong driving force, low fuel consumption, high economic benefits. Machine Parts Name: derrick platform Brand: KH Original: China Domestic famous, strong driving force, low fuel consumption, high economic benefits. After-Sales Service * Training how to instal the machine, training how to use the machine.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> derrick made in china

Based on our extensive experience in the design of land rigs and special vehicles, Sovonex™ truck-mounted drilling rigs are a prime example of advanced engineering.

When drilling on impassable terrain or in remote areas, our truck-mounted drilling rigs’ excellent off-road capability and mobility can make the difference between a drilling operation being commercially feasible or not.

With our extensive experience in the manufacturing of skid-mounted rigs and oilfield vehicles, we are able to design each Sovonex™ mobile rig to individual customer requirements.

Your mobile drilling rig can be 100% made in China, or you can choose rig components from distinguished international suppliers as you like. By default, the following rig components are imported:Main diesel engines: Caterpillar

A key advantage of our truck-mounted rigs is their uniquely constructed chassis. Designed for extreme stability and with a small turn cycle, they give the rigs the power and mobility required for driving on impassable terrains.

Customers can choose between different types of suspensions, including single wheel independent suspension. A mobile rig with independent suspension is especially advantageous when driving in inaccessible mountain regions.

At our production facility in China we manufacture the complete range truck-mounted and trailer mounted drilling rigs capable of drilling wells from 1000m to 4000m. Below you will find a detailed description for each of these rigs.

This 4000m truck-mounted rig with a power of 1000 hp is the most powerful among our mobile rig and often employed in geothermal drilling operations in remote mountain regions.

We do manufacture both truck-mounted and trailer-mounted drilling rigs. While truck-mounted rigs are more compact and easier to handle in rough terrain, the truck of a trailer-mounted rig can be used for other purposes during drilling operations.

The 4000 m mobile rig can optionally be equipped with a top drive system. We provide repair and maintenance services for all major top drive manufacturers like Varco, Canrig, Tesco, BPM, MH, and Bomco

With every drilling rig we send technical staff to the drill site to provide first hand technical support. The engineer responsible for the design of the rig is always part of the service crew.

For your convenience, here is a summary of the benefits of our truck-mounted drilling rigs we consider the most important:Production quality standard API Q1 and ISO 9001

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> derrick made in china

Their exceptional mobility, stability, and ease of operation are the outcome of our extensive experience in the design and production of mobile drilling rigs.

Belonging to the same family, Sovonex™ service rigs comprise many of the technological advantages that result in smooth operation and make the life of our customers’ easier:

Wide selection: At our production facility in China we design and develop workover rigs for service depths ranging from 1,600 m to 8,500 m (5,250 ft-27,900 ft), and workover depths from 2,000 m to 9,000 m (6,600 ft-30,000 ft) for 2 7/8” DP.

Full API coverage: The different components of our well-servicing rigs are manufactured to the following API standards:Steel structures, such as the mast: API Spec 4F

Highly maneuverable : Sovonex™ mobile drilling rigs and self-propelled workover rigs possess excellent driving properties in the desert, mountain, and other impassable terrains.

Reduced NPT: The mast is erected hydraulically to reduce time for rig up and increase safety. Likewise, all rig components have been designed to allow for fast assembly and disassembly.

With every service rig, we send technical staff to our customer to provide first-hand technical support. The engineer responsible for the rig design is always part of the service crew.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> derrick made in china

The automatic operation equipment for minor workover is mainly composed of a wellhead operation device, hydraulic elevator, pipe and rod transmission and arrangement device and electro-hydraulic control system.

The device adopts the structural form of dispersing the functional modules and integrated installation on the workover rig: with the hydraulic tong, manipulator and anti splash snap device set on the derrick of the workover rig, which can expand and rotate, and the safety slip is installed above the BOP.

The device only needs to install safety slips, which realizes rapid installation and migration and shortens the auxiliary working time. The device has the function of moving back and forth, left and right, which is convenient to align the wellhead. The height of the hydraulic tong is adjustable and can adapt to the wellhead with different heights. Hoisting equipment and special transport vehicles are not required for the installation and removal of the device.

The main electric control box can be installed on the operation vehicle or integrated into the modular wellhead operation device. The make-up torque of various oil pipes is set on the touch screen to realize automatic make-up and break-down. Equipped with video monitoring, process prompt, safety alarm, etc. The control system has a perfect action interlocking function to ensure the safety and reliability of the workover operation process. All of the electric cabinets, sensors, connectors meet the requirement of Explosion-proof on field.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> derrick made in china

Naturally, with such attractive conditions for human habitation, Sichuan has been occupied by humans since the early dawn of our existence. The countryside has been worked by the human hand for so long, that it is hard to spot a single wild area in the basin proper. Even steep hillsides are terraced for farming, and ancient family crypts hewn into rock cliff outcrops can be spotted frequently from the highway. The contrast between the luxury cars speeding along the modern 6-lane highways, and the ancient terraces, tombs and irrigation systems is startling, but one can easily imagine one long continuous evolution of human technology here, from thousands and thousands of years ago, to the present. Many of China’s ancient technical accomplishments came from this region, including sophisticated irrigation techniques, and what I am particularly interested in, their drilling technology.

At some point around 2,000 years ago the leap from hand and shovel dug wells to percussively drilled ones was made (figure 4). By the beginning of the 3rd century AD, wells were being drilled up to 140m deep. The drilling technique used can still be seen in China today, when rural farmers drill water wells. The drill bit is made of iron, the pipe bamboo. The rig is constructed from bamboo; one or more men stands on a wooden plank lever, much like a seesaw, and this lifts up the drill stem a metre or so. The pipe is allowed to drop, and the drill bit crashes down into the rock, pulverizing it. Inch by inch, month by month, the drilling slowly progresses. It has been speculated that percussive drilling was derived from the pounding of rice into rice flour. When I read of this technique in Salt, I imagined a fairly crude technology. I had no idea how sophisticated these drilling methods became, to the point where these people really had developed most of the tools and techniques one might see on a modern drilling rig, albeit on a smaller scale and without the benefits of modern machining methods.

A major breakthrough was achieved around 1050 AD, allowing deeper wells, when solid bamboo pipe was replaced by thin, light, flexible bamboo “cable” (figure 9). This dramatically lowered the weight that needed to be lifted from the surface, a weight that increased with the depth being drilled. By the 1700s Sichuan wells were typically in the range of 300 – 400m deep, and in 1835 the Shenghai Well was the first well in the world to exceed 1,000 metres of depth. In comparison, the deepest wells in the U.S. at that time were about 500m deep. The Sichuan salt producing industry was centred around Zigong, and early photographs show hundreds of producing derricks (“heaven carts”; figure 10), salt stove operations, and the Fuxi River jammed with salt trading boats (figure 11). Brine and natural gas were transported through 100s of kilometres of bamboo pipeline (figure 12).

Figure 10. A photo of Zigong early in the 20th century showing many of the derricks used to drill and produce brine and gas wells. Some of these "Heaven Carts" were over 100m tall!

Figure 13. An ancient sketch originally fro m "The Annals of Salt Law of Sichuan Province". A "Kang Pen" drum is seen in the centre foreground, with gas pipes directly feeding the salt stoves on the right. At the top, brine from a remote well is being carried in buckets by men, who feed it into a bamboo pipeline that runs down to the stoves. One of the carriers is being paid at top left, and it appears that a blow out is depicted on a new well being drilled in the left foreground; maybe the men operating the drill rig have run away, as tragically happened at a Chongqing, Sichuan sour gas well, late 2003.

My brief visit to Sichuan left me intrigued, fascinated, and eager to learn more about China’s ancient technical accomplishments. I can highly recommend the region as a place to visit, not only for its interesting historical sites, but also for its natural beauty (most of Sichuan is mountainous and unpopulated, especially the west, with bamboo forests, and panda bears), its rich culture with many interesting ethnic minorities, its delicious food, great shopping, and its wonderful, friendly people. However, the highlight of my trip was the visit to the Salt Museum, and I hope I have passed on my enthusiasm for this topic to readers.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> derrick made in china

WILSON WELL SERVICE RIG  (Ref#3000Ta)  103’ x 248,000# derrick, Out of service since 2017, lot of rust, will start and run and/or drive down the road POR

Refurbished, 700 hp, Double drum 2042 drawwroks with Parmac 202 brake assist, (2) Caterpillar 3406 Engines, (2) rebuilt Allison 750 6 speed auto transmission with reverse. 112" x 300,000 # hook load capacity on 8 lines, clear height 97 feet, leg spread  7" 6-1/2", racking board, oil bath chain case, elevated rotary drive, all raising lines and guidelines. The Draw-works, hydro-mantic break, and crown assembly have been rebuilt. Heavy duty Draw works drive propeller shaft through right angle gear box, rotary drive propeller shaft, heavy duty reverse gear box and oil bath roller chain, and a self-locking handling winch.  Mounted on triple front axle mechanical 6 axle carrier with 134,000# capacity designed to meet highway safety standards with necessary toughness for off road operations.  Price:  $265,000

Built 2012, 42 x 12 drawworks, Cat C15 (475 hp) engine,  112’ x 300,000# derrick, mounted on 5 axle carrier.  Includes skid mounted Gardner Denver PAH mud pump with Detroit 8V92 engine (gear end is good, but needs fluid ends machined or replaced).  Package Price:  $270,000

Manufactured 2014, 72’ x 180,000# derrick on 4-line (250,000# on 6-line), mounted on 5 axle carrier, Detroit Series 60, Allison transmission, all hydraulic, 8000’ of 5/8” sandline, 100 ton McKissick casing blocks, 1” line 42” x 12” casing drum, 42” x 12” sand drum, disc assist on casing drum, 1500 hours, 3000 miles.  Westco power tongs 1-1/2”, 2”, 2-7/8” and 5-1/2”, set of bails/links, tubing elevators 1-1/2” – 2”, rod hook, elevators, wrenches, swab tools, Martin Decker weight indicator, stored inside  Price:  $645,000

Derrick fell onto rig when being raised, derrick would need to be replaced or repaired.  Built 1981, double drum, 42 x 12, 42 x 8, swab drum removed from jack shaft, 5-axle back in carrier, 250,000# derrick with double racking board and triple rod basket, Cat 3408, CLT 5860 transmission, Cooper right angle box, 4 hydraulic leveling jacks, air rod transfer in derrick, hydraulic winch, Kerr 6 cyd 10000 psi Mustang pump powered from jack shaft, Kerr 3-valve release 10,000 psi, tong carrier f/Foster, steel work platform, Parmac 22 SR hydromatic brake.  Extra rebuilt 3408 Cat engine.  Price as is:  $112,500

Chinese built 2006, 8300 hours, 104’ x 250,000# derrick, rod basket and tubing board (18000’ tubing capacity), Detroit Series 60 diesel engine, 5680 Allison 5-speed transmission, sandline drum with 14,500’ 9/16” sandline (new January 2022), main drum with 1’ drill line on 6 lines with conventional brake pads and brake assist (new November 2021), brand new winch line (replaced May 2022), mounted on 6 axle carrier (2 steer, 2 drive and 2 tag), total weight 100,000 lbs., currently working  Price:  $270,000

Manufactured 1981, 400 CCC drawworks, single 22” Hydromatic, 96’ x 215,000# CCC derrick (level 4 inspected 2015), mounted on 5 axle carrier, Detroit 60 Series 14 liter engine, Allison 5860-2 drop box,  1 winch, work floor, McKissick 83 block, 72” links, BJ RS tubing tong with manual backup, pad type weight indicator, 2 7/8 – 2-3/8 100 ton, 14,000’ 9/16 sandline capacity, 875’ 1” drill line,   Price:  $395,000

Rebuilt 2010 to Level IV, Double drum drawworks, Detroit 6V53 diesel engine, Allison 5860 3-speed transmission, 60’ x 100,000# stiff mast derrick, 4 lines with 4’ well spacing, 35-ton McKissick block and hook (2) 17” sheaves 7/8” wire, 75-ton elevator bails with 25-ton elevator pickup adapter, working floor, stairs, handrails, lights, 20’ lubricator, 5000 winch with hook, tandem axle single steer drive carrier, located Canada  Price:  $120,000 USD

Manufactured 2008, 72’ x 150,000# derrick, Detroit Series 60 engine, mounted on 4 axle Crane Carrier, tooled out, Guiberson T60 air slips 100 ton casing blocks, Westco power tongs, currently working   Price:  $445,000

Manufactured 1981, mounted on 5 axle carrier, double triple service rig, 96’ x 250,000# derrick, Detroit Series 60 12.7 diesel engine, Allison transmission, 9/16” sandline, 1” drill line,  hydraulic jacks, hydraulic catwalk, travelling block, tubing bard, rod basket and all necessary lines.  Tooling not included.  Price:  $115,000

Rebuilt 2010, double/triple, 8V92 Detroit with Turbo charger and after cooler, trailer mounted, single drum drawworks, Allison transmission 588 Series, 102’ x 225,000# derrick, gooseneck 3 axle trailer

Manufactured 1983, double drum, 96’ x 180,000# derrick, mounted on 5 axle carrier with 92T engine, Allison transmission  Price rig only:  $300,000  Price with tooling:$340,000

WILSON 42 WELL SERVICE RIG(Ref#7562Ta)  Manufactured 1975, 180,000# Pemco double/triple derrick, mounted on Wilson carrier with Detroit 8V71 engine, 4 hydraulic leveling jacks, ready to work  Price rig only:  $74,500  Price with tooling:  $94,500

Manufactured 1983, 70" x 120,000# non telescoping stiff mast, double drum 26 x 8, Detroit 6V71 diesel engine, 740 Allison transmission with Spicer power divider, mounted on 4 axle carrier.  Rig runs and truck drives, stacked for several years, good condition  Price:  $93,500 USD

110’ x 250,000# Cooper derrick, Detroit 60 Series engine, 6061 Allison transmission, 6 axle Pettibone carrier, 3 front and 3 rear axles, drop box converted to air control, tubing drum, sand drum, 24” Wichita clutches  Price:  $315,000

Manufactured 2009, 96" x 205,000# derrick, TI 260 drawworks, 48" sandrum brake, 9/16" sandline, 1" Lebus grooved tubing drum, 60" turbing drum brake size, 41,500# max single line pull Price:  $425,000 PRICE REDUCED: $389,500

FRANKS 500 WORKOVER RIG(Ref#7615Tc)  Built 1980, refurbished 2018, 102’ derrick, 150 ton blocks, 15,000’ sandline, new engine and transmission, ready to work  Price:  $430,000

FRANKS 400 WORKOVER RIG(Ref#7615Ta)  Built 1979, refurbished 2017, 102’ x 215,000# derrick, 100 ton blocks, 15,000’ sandline, 4 lines  Price:  $390,000

Built 1981, refurbished in 2018, 102’ derrick, new drilling line, no sand line, 100 ton blocks, 2 winches, has not worked since refurbishment.  Price:  $390,000

FRANKS 300 SERVICE RIG(Ref#1169Ta)  4-legged derrick, Series 60 Detroit engine, 6850 Allison transmission, blocks, Foster tongs, mounted on 4 axle carrier, working condition  Price:  $37,500

Double drum Wilson Sr and Wilson JR drawworks, sandline capacity 10000" of 3/16", mounted on tandem axle, 1987 Freightliner tandem axle truck powered by Detroit diesel engine, 2 hydraulic leveling jacks, Detroit diesel on deck, 50" hydraulically raised mast, brand new hydraulic cylinder just replaced for lifting derrick, has pulled a minimum of 3000" wells, all new hydraulics   PRICE:  $137,500

WILSON MOGUEL 42 WELL SERVICE RIG(Ref#3177Tb)  Two available, 96" x 280,000# mast, Detroit Series 60 engine, 5860 Allison transmission, mounted on 5 axle Wilson carrier, handling tools  Price:  $315,000

Double/Triple 96" x 225,000# derrick, 60 Series Detroit engine, mounted on 4 axle carrier, 750 Allison transmission, sandline, blocks  Price:  $72,500

Built 1980, 102" x 260,000# derrick, factory rebuilt Detroit 8V92T engine installed April 2010, inframe on motor 2015 derrick sandblasted and magnafluxed July 2006, new chain on main drum October 2017, brand new rear end and rear drive line and axels Sept 2016, new drill line and winch line November 2017.

Workover rig with 83’ telescoping derrick, 10’ crown extension, 200,000# lift capacity, 100,000# snubbing capacity.  Catwalk with 42’ reach, forward and revere motion, hydraulic pipe slide, six portable pipe racks, powered by workover rig.  5000 ft/lb hydraulic rotary, 15k psi working pressure capability kelly hose, 300 ton mast with 5 x 5 heavy wall box tubing and 2 x 2 heavy wall cross sections, (2) mast raising cylinders, 9-1/8 x 25’ telescoping cylinders/crown sheaves with cable guides, (2) winch sheaves/snubbing sheaves, SRS fall protection, retractable flow tube design, non-swivel boom pole on curb side winch, (2) mast supports, 1” lifting cables, mounted on 5 axle Crane Carrier (3rd axle drop), with 375k Volvo Penta engine, 150 gal fuel capacity, hydraulic self-leveling components, 6 speed Allison transmission, 1:1 gear box, (2) 65 gpm pumps, (2) 30 gpm pumps, (1) 28 gpm Commercial shearing pump, 40 gal accumulator storage, single man cab, hydraulic leveling jacks  Price on Request

Year 2006, double drum, 8V71 Detroit diesel engine, 5860 Allison automatic transmission, mounted on 5 axle Crane Carrier, 108’ x 225,000# derrick, 100 ton McKissick 3-sheave block, fully tooled with 6’ bailers, 58-93 tongs, 2-3/8 and 2-7/8 elevators, 3/4 and 7/8 rod elevators and wrenches, eight indicator, laydown floor  Price:  $162,500

Refurbished, Double/Triple, 96" x 215,000# derrick, Detroit 60 Series, mounted on 4 axle carrier, 750 Allison transmission, sandline, blocks Price:  $102,500

Manufactured 1982, Tubing drum 42 x 12, sand drum 38 x 8, Detroit Series 60 diesel engine, 96’ x 200,000# derrick with set of tubing blocks, hydraulic and air hoses gone through, installed all new engine harness and electrical wiring to all lights, transmission.   Rebuilt valve bank  Price:  $200,000

Manufactured 1960’s, double drum, single rig mast, 64’ x 250,000# (tubing and rod racks), 70 ton blocks, 2 lines, Detroit diesel 60 gpm @ 2000 psi, hydraulic system, air clutch.  Rig was refurbished 2013/2014 at a cost of $130,000: repairs included used 65’ derrick installed, new 1” main line, repairs to air system, hydraulic system upgrade, leveling jacks, derrick ljghting, tires, 70 ton blocks installed.  But the rig has been sitting since 2015 and now needs rebuilding. It doesn’t run.    Price as is: $19,500

Manufactured 1980, completely refurbished 2004, 5 axle double drum well service unit, double 15 Parmac brake on main drum, 96" x 180,000# hydraulic raised mast, mast lighting, Detroit 60 Sereis engine, 5860 Allison 6 speed transmission, 4 hydraulic leveling jacks, dual manual outriggers, PD12 Braden utility winch, McKissick 100 ton tubing block 21-31 diving, 1000" of 1" tubing line, 13000" of 9/16" sandline  Price:  $225,000

CARDWELL KB200B SERVICE RIG(Ref#11674Ta)  72’ x 140,000# stiff mast, 40 x 10 double drum drawworks, 2 aux deck winches, tubing board, rod board, cat walks, railing, stairs, floor BOP controls and accumulator bottles, McKissick 75 ton tubing block and hook, mounted on 5 axle carrier, Detroit 8V71 diesel engine, Alliston CLBT4460 auto transmission PRICE:  $127,500

Rig manufacture 1980, mounted on 1980 GMC Brigadier with Cat 3208 engine, includes elevators & misc tools, also includes 1996 1-ton Super Duty tool truck, tandem axle, Cat 3208 diesel, sitting 1-1/2 years  Price:  $92,500

95’ x 212,000# Ideco telescoping derrick, 42 x 10 double drum drawworks, 100 ton McKissick block and hook, hydromatic, tubing board, monkey board, catwalks, railings, stairs, lights, ladders, mounted on 4 axle carrier, Detroit 8V71 diesel engine, Alliston CLT 5860-DB automatic transmission  Price:$137,500

104’ x 225,000# telescoping double derrick, 42 x 10 double drum drawworks, hydromatic, 100 ton McKissick block and hook, mounted on tandem steer/tandem drive carrier, Cat 3406T diesel engine, Allison CLBT-5860-2 automatic transmission  Price:$137,500

1980, 475 hp, single drum (new), reworked, 96" x 205,000# hydraulically raised mast, 6 lines,  crown block: 3 new sheaves blocks and bearings, racking board, guide wires, (2) hydraulic hoist, weight indicator, block, elevator links, fall safety device, work platform, mounted on 4 axle carrier with Detroit Series 60 diesel engine, Allison transmission, rig in excellent condition and has been well maintained, ready for use   PRICE: $115,000

SKYTOP BREWSTER RR400(Ref#13190T) Mounted on 4 axle carrier, single drum drawworks, 8x7 disc assisted brakes, tubing board, Cat3406B engine, Allison 860DB transmission, 100 ton McKissick block, Foster 58-92R tongs, misc hand tools, approx 36" base beam for rig, ready to work  Price:  $110,000

Manufactured 1976, 50 Series Detroit engine, 4460 Allison auto transmission, 96" x 180,000# Skytop derrick, 100 ton McKissick blocks, 7000" of 9/16" sandline, BJ tubing tongs, Guiberson air slips, 2-3/8 and 2-7/8 elevators, rod wrench, rod elevators, weight indicator, lubricator pump, misc tools  Price:  $320,000

500 hp, manufactured 2007, Pemco 104" x 225,000# derrick, double triple, 100 ton McKissick blocks, BJ style tubing tongs, rod tongs, rod basket, 8"3" bales, 16,993 miles on truck, 4016 hours, all handling tools

Built 1966, Double drum 1058 drawworks, 8500’ sandline, blocks, 96’ x 150,000# derrick, mounted on 4 axle carrier, Detroit 6V92T replaced August 2019, PTO, power steering and alternator/generator needs modifications to work with new Turbo diesel engine

Refurbished 2017, 4 lines, 96’ x 205,000# mast, 8V71 Detroit engine, mounted on CCC, 75 ton McKissick blocks, tubing board, rod basket, work platform, rigged up and working in field  Price:  $295,000

Manufactured 1977, 72’ x 125,000# derrick, 8V71 Detroit engine (rebuilt), Allison 750 transmission, 6500’ of new 5/8” sand line, tubing line new, drum brakes new, new style McKissick blocks, working daily  Price rig only:  $157,500

Double drum drawworks with hydromatic brake, 10" brakes, 96" x 180,000# derrick, mounted on 4-axle PEMCO carrier with hydraulic support legs, 8V71 Detroit, 4460 Allison transmission, Spicer 784 split shaft gearbox, 250 hp right angle drive, 650" of 7/8" tubing line, 8000" of 9/16" swab line, 100 ton Sowa block, hydraulic winch, hydraulic weight indicator, 84" links, 2-3/8" and 2-7/8" tubing elevators, BJ tubing slips, Foster 5893R power tongs with lift in derrick, rod hook, rod stripper, rod elevators, wrenches, transfers, rod fishing tools, misc hand tools and connections  Price:  $140,000

Manufactured 1974, double drum drawworks,  double triple 96" x 180,000# derrick with a hydromatic. The rig has working line with heavy traveling block and approx. 12,000" 9/16 sand line. Mounted on Skytop carrier with tandem steering and rear ends 4 axles W/ tag axle, 4 leveling jacks, powered by an 8V-71 with a Allison 4460 transmission, (note transmission was overhauled in early 2000"s) and the engine has a new head on right bank. The rig has two leveling jacks on the rear and two leveling jacks on the front which are located right behind the steering axels. Tooled out with hydraulic rod and hydraulic tubing tongs, air slips, rod and tubing elevators, hand tools and misc over items. PRICE REDUCED:  $115,000

10 x 13 pole, double Drum, Franks 33” air over grease, brakes in good shape, 7/8” tubing line, tubing blocks, tong pressure adjustment, hi/low on tubing, air slips control, master kill on drawworks, Foster 36 with 8’ lift ram, air backup, swing around tong rack, mounted on 2001 Freightliner F80 truck, Cat C12 Series 3125, Fuller 9-speed transmission, PTO, winch for pole scope Tulsa 48, blocks raise pole, dual fuel tank, dual battery, 50 gal hyd tank, toolboxes, hydraulic outriggers, BJ rod tongs, ¾” and 7/8” heads, tools, swabs, extra tongs, orbits, drilling head  Price:  $242,500

Double drum (second drum is removed, rig is running as single drum), hyd pole and down riggers, mounted on 1990 Crane Carrier, 9 sp Eaton Fuller transmission, 100,000 miles, 8 x 10 telescoping poles, 3/4” cable, no tooling  Price:  $52,500

10 x 13” pole, single drum, mounted on 1980 Brigadier 9500 Series truck with 671 inline Detroit, drop box, travelling blocks, tubing lines, hyd jacks, no tooling, sitting since 2000  PRICE:  $49,500

Cable Tool Drilling and Completion Rig, 60" double poles rated to 150,000#, 5000" drill capacity, 10,000" pull capacity, propane Waukesha 145 engine, 500 gal propane tank, trailer moutned with International 4300 truck, last drilled 2012, 2300" drill line on drum, 3500" on spool casing drum, heavy block sandline drum, cat heads each side, tooling, spare engine  Price:  $72,500

400’ of 7/8” block line, 9/16” sandline drum (no cable), 2000’ of ¾” drilling drum, 3 McKissick sheaves, air clutches and controls, mounted on 1961 Mack truck with 250 hp Cummins engine, older rig but runs good.  Includes elevators, oil saver pump, no BJ tongs, currently working.  Price:  $87,500 - Pennsylvania

Triple drum, friction clutch, cathead (sandline holds 2400’ of 5/8” line), mounted on tandem axle Chevy truck with 427 gasoline engine, 8-5/8” x 45’ single pole, new tires, power steering, wireline unit, good usable rig for shallow oil/gas lease, drills, workover, swab capabilities, no tools  Price:  $112,500 - Oklahoma

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> derrick made in china

KSM550 DOUBLE DRUM WORKOVER RIG(Ref#8731R)  mounted on 5 axle carrier, tandem steer, tri-drive rear powered by Seres 6-0 with Allison 5860 transmission, 104" x 240,000# hook load (8 lines) mast,

HUBBARD C500 WORKOVER RIG(Ref#654T)  Built 2012, 42 x 12 drawworks, Cat C15 (475 hp) engine,  112’ x 300,000# derrick, mounted on 5 axle carrier.  Includes skid mounted Gardner Denver PAH mud pump with Detroit 8V92 engine (gear end is good, but needs fluid ends machined or replaced).  Package Price:  $270,000

HUBBARD C400 SERVICE RIG(Ref#274Tb)  Manufactured 2014, 72’ x 180,000# derrick on 4-line (250,000# on 6-line), mounted on 5 axle carrier, Detroit Series 60, Allison transmission, all hydraulic, 8000’ of 5/8” sandline, 100 ton McKissick casing blocks, 1” line 42” x 12” casing drum, 42” x 12” sand drum, disc assist on casing drum, 1500 hours, 3000 miles.  Westco power tongs 1-1/2”, 2”, 2-7/8” and 5-1/2”, set of bails/links, tubing elevators 1-1/2” – 2”, rod hook, elevators, wrenches, swab tools, Martin Decker weight indicator, stored inside  Price:  $645,000

IRONTECH SR42 SERVICE RIG(Ref#970Tb)  Built 2005, 104’ x 225,000# telescopic double free-standing mast, 42” x 10” drawworks, 38” x 8” sandline, Detroit Series 60 engine, Allision 5860 transmission, mounted on 5 axle carrier tandem steer/tri-drive, Level IV completed in 2014 (16,270 CAODC mast hours remaining)  Price:  $755,000 CDN (approx. $600,000 USD)

SERVICE KING 675 DRILLING RIG(Ref#6830T)  Manufactured 2008, 104’ x 315,000# derrick, single drum with 8 lines 1-1/8” wire, dual 6’ hydro breakout, Ideco 7-1/4 x 15” duplex mud pump with 353 Cat engine, 150 ton swivel, 4-1/2” x 40’ kelly, (8) 6-1/4” collars (new), 5000’ of 4-1/2” 1660 X-hole drill pipe Double White, (2) 300 bbl mud pits, 150 bbl water tank, doghouse, 12’ substructure with 18” rotary table, center tub with v-door, (2) pipe tubs, 42” x 30’ pipe rack, (2) landing mats for rig and sub, (2) 6’ elevator links, 4-1/2” 150 ton elevators, (2) sets of slips, rat hole digger with boot, (2) Type B BJ tongs  Price:$390,000

SERVICE KING SK 375 (REF#6121R)  Manufactured 2011, 475 hours, 3750 miles, 42 x 10 – 38 x 8 drawworks, “like new", 96" x 180,000# hydraulically raised mast, 4 axle carrier w/ 60 series Detroit engine, 4500 OFS Allison transmission, 500hp right angle box, 4 hydraulic leveling jacks.

SERVICE KING SK-175 WORKOVER RIG(Ref#274Ta)  Manufactured 2008, 72’ x 150,000# derrick, Detroit Series 60 engine, mounted on 4 axle Crane Carrier, tooled out, Guiberson T60 air slips 100 ton casing blocks, Westco power tongs, currently working   Price:  $445,000

ZJ70LDB2000HP DRILL RIG(Ref#15720T)  Manufactured 2009, well-maintained by large international contractor, currently stacked in Asia.  (Cost $10,000,000 USD new).  This is a complete turnkey package including tubulars and is ready for shipment.  Full inventory and photos available on request.  Price:  $4,000,000

XJ650 WORKOVER RIG(Ref#15410N) New, Double drum, 24,600" service depth, 18,400" workover depth, 111 x 330,470# mast, CAT C18 700HP diesel engine, TC-680 transmission, 6 axle carrier 37mph, Right angle gear box, Price:$1,700,000

PETRO XJ400 WELL SERVICE RIG(Ref#6016Ta)  Built 2005, 104" x 225,000#, double drum, Detroit Diesel 60 Series engine, Ellis Williams 440 Triplex mud pump, 150 bbl mud tank, gas buster, base beam, double BOP, 8 x 20 doghouse and related support equipment, missing tongs, missing slips and hand tools  Price:  $355,000

PETRO SXJ400 WELL SERVICE RIG(Ref#6016Tc)  Built 2012, 104" x 225,000# capacity, double drum, Detroit diesel Seriel 60 engine, base beam, double BOP, 8 x 20 doghouse and related support equipment, Missing Ellis Wiliams 440 triplex pump, 150 bbl mud tank, gas buster, tongs, slips and handling tools, fair condition  Price:  $357,500

PETRO SXJ400 WELL SERVICE RIG(Ref#6016Td)  Built 2012, 104" X 225,000# capacity, double drum, Detroit diesel 60 series, Ellis Williams 440 triplex mud pump, 150 bbl mud tank, gas buster, base beam, double BOP, tongs, slips, 8 x 20 doghouse, handling tools and related support equipment, missing tongs, slips and handling tools, good condition  Price:  $510,000

PETRO SXJ 400 WELL SERVICE RIG(Ref#6016Te)  Built 2013, 104" x 225,000 capacity, double drum, Cat C15 diesel engine, Ellis Williams 440 triplex mud pump, 150 bbl mud tank, gas buster, base beam, double BOP, tongs, slips, 8 x 20 doghouse, handling tools, related support equipment, missing BOP, tongs, slips and some handling tools, fair/good condition  Price:  $410,000

PETRO SXJ 400 WELL SERVICE RIG(Ref#6016Tf)  Built 2013, 104" x 225,000# capacity, double drum, Cat C15 diesel engine, Ellis Williams 440 triplex mud pump, 150 bbl mud tank, gas buster, base beam, double BOP, missing tongs, slips and doghouse, good condition  Price:  $525,000

750 HP WORKOVER RIG RIG MANUFACTURED(Ref#8942R)  Manufactured 2011, used 6 months, 750hp double drum drawworks, CAT C15 540hp each, rated 3000M w/ 5" DP, 6m rig floor, 27-1/2" rotary table, 2 section telescopic mast, 38m x 2250 kn hook load, Rg swivel, Volvo Penta (2) 430kw, mud system, (2) x 800hp Bomco F-800 mud pump, 2x liner shakers, desander, desilter, mud system capacity 300m3, water tanks capacity 40m3, Located Middle East.  PRICE: $6,300,000

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> derrick made in china

BEIJING, China, June 2021 – Sinopec SJ Petroleum Machinery Co. (SJP), a leading Chinese oil field equipment maker, has selected Allison Transmission’s 4500 Oil Field Series™ (OFS) for its new light workover rig.

During oil and gas recovery operations from underground reservoirs, chemical and mechanical processes can affect the wellbore, negatively affecting production and causing surface and downhole equipment to fail. Light workover rigs, which can reach remote oil fields swiftly and handle production emergencies efficiently, are always in high demand.

SJP’s latest light workover rig model (GVW at 46 ton) adopts a truck-mounted CNHTC chassis and is equipped with an MC11.40-60 diesel engine rated at 297 kW, coupled to a light and compact Allison Transmission 4500 OFS, which can deliver maximum torque of 1900Nm. The new light workover rig model also carries hydraulic lifting derricks, winches and drilling rigs.

“Our latest model, a light truck-mounted drilling and workover rig, has two main duty cycles: driving the rig to the work site (road mode) to running a second function (work mode), specifically in oil wells that require consistent, durable power and high reliability,” said Zhang Bin, Vice President of SJP Drilling & Repair R&D Center. “Allison has a wide range of oil field transmissions for different work conditions. The Allison 4500 OFS model can be matched with the biggest engines where it can deliver maximum output torque up to 2237 Nm, while being light and compact. It meets the needs of both duty cycles very well.”

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> derrick made in china

This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.

<a href='https://www.ruidapetroleum.com/product/category/Drilling-Rig-and-Workover-Rig'>workover rig</a> derrick made in china

A. PURPOSE. This instruction provides guidelines to Federal OSHA and Plan States compliance officers, 7(c)(1) consultants, employers, and employees on the stability of well servicing derricks.

C. ACTION. Regional Administrators and Area Directors shall provide copies of the attached Guideline on the Stability of Well Servicing Derricks to the appropriate Federal an State personnel and ensure that copies are available for distribution to the public upon request.

F. BACKGROUND. There have been several fatalitites as a result of derrick collapses caused by the failure of temporary anchors in the oilwell drilling and servicing industry. Since OSHA has no applicable standards, in many of these incidences, our field office have attempted to cite under the General Duty clause, section 5(a)(1) of the OSHact. This action, however, may not be adequate in addressing the problem. Therefore, to assist OSHA compliance officers, State compliance and consultation personnel, employers, and employees, in the recognition of the hazard of derrick collapse due to the failure of temporary stability systems, OSHA contracted Sigma Associates, Ltd. to develop guidelines detailing the type of temporary stability systems, type of soils and its holding capacity, methods of installing guywire anchors, integrity determination of the system, actual pull testing, and acceptable parameters in liew of actual pull testing (Appendix A).

SCOPE: To provide a representative basis for determining the availability, capability, dependability, reliability of Stability Systems on Land Based Work-Over Rigs and the recommended practices and procedures for their safe use.

A typical double derrick with load guys in place in Figure 2-1. The sub-structure is in place and the unit properly configured to begin installation of the guying system. From this configuration determination can then be made as to the proper selection, location, configuration and holding capacity of guy anchors. Load guys should meet manufacturers recommendations. In the absence of manufacturers recommendations, the minimum wire rope diameter should not be less than that which is recommended by a representative of a major, oil field recognized, wire rope manufacturer.

The rig location area may grade away from the well bore along centerline II at a maximum drop of 1:20. The cross grades, parallel to centerline I, should be level. The area shall provide a minimum bearing capacity of 6000 psf.

There are several States which have statutorily addressed the installation of Guy Anchors. The State of Michigan, for example, references the American Petroleum Institute Specification, API SPEC 4E. Alaska requires that Derricks be effectively guyed, braced, or otherwise engineered to resist overturning in accordance with generally recognized safe practices in the industry. (Industry practices are discussed in Section 1).

It should be pointed out that zone determination is a function of angle and distance. Zone "D" will be discussed first for only Single Derricks may be located in this zone and they will require a minimum 10,000 pound anchor, anywhere in the zone. (This is not the case in other zones which will be discussed later.) Zone "D" ranges through all four quadrants. Your attention is directed to the Northeast Quadrant. The zones parameters begin at the 22.5 degree radial and end at the 67.5 degree radial using line segment OE as the zero radial . The nearest point of Zone "D" to the Well Head is 35 feet and is located on the 45.0 degree radial. (see Southwest Quadrant). The far point of Zone "D" on the 45.0 degree radial is 50 feet. (see Northeast Quadrant).

The minimum anchor holding capacity required for any other location and/or other than single derricks will be determined by Zone and horizontal distance from the "Well Head".

Using the chart: An anchor in Zone "A" located a horizontal distance of 70 feet from the "Well Head" would require an anchor of what minimum holding capacity? On the chart move along the horizontal legend from left to right until you reach 70 feet. At this juncture proceed vertical until you intersect the curved line for Zone "A", now follow the intersecting horizontal line, left toward the vertical legend. We have now determined that the minimum holding capacity for the anchor, at this precise location, is 20,000 pounds.

Standing at the "Well Head", with the well bore immediately to your back, proceed North (in direction monkey board is facing) 24 paces. (The pace length is not as important as the numerical relationship of the units and the consistency of the unit length. The method will work with any unit of length as long as the same unit is used throughout.) Place a stake or other marker at this location (Bench Reference). Turn West 90 degrees and proceed forward 10 paces. At this location turn your body so that the front portion of your anatomy is approximately parallel to the radial of the guy anchor. If the northwest guy anchor is forward of your right shoulder and the southeast guy anchor is aft to the rear of your left shoulder, it can then be presumed that the radial angles are within acceptable parameters. Repeat the procedure from the bench reference, this time to the east, proceed ten paces. In this orientation the northeast anchor should be forward of the left shoulder and the southwest anchor should be aft of the right shoulder.

After the location has been selected and the site prepared, erection of the "DERRICK" and its stabilization system can proceed. Presently the API, AOSC and IADC recommend the following basic procedure, with reference to Figure 5-1:

A survey of 13 drilling contractors operation 193 drilling rigs in northern Canada and Alaska indicated that there is a wide range of experience and operating practices under extremely low temperature conditions. While there is very little precise information available, there have been a sizeable number of failures in portable masts while in the lowering or raising process in winter. Thus the exposure to low temperature failures focuses on mast lowering and raising operations. Based on reports, however, this operation has been accomplished successfully in temperatures as low as -50 degrees F. While the risk may be considerably greater because of the change in physical characteristics of steel at low temperatures, operators may carry on "normal" operations even at extremely low temperatures. This may be accomplished by a program of closely controlled inspection procedures and careful handling and operation. This should reduce damage and impact loading during raising and lowering operations. At the present, there seems to be no widely accepted or soundly supported basis for establishing a critical temperature for limiting the use of these oilfield structures. Experience in the operation of trucks and other heavy equipment exposed to impact forces indicates that -40 degrees F may be the threshold of the temperature range at which the risk of structural failure may increase rapidly. Precautionary measures should be more rigidly practiced at this point. The following recommended practices are included for reference:

If maintained to these tolerances the sags will indicate a pretension of 1000 pounds for crown to ground guywires and 500 pounds for tubing board guywires. this is based on the use of 5/8 inch, 6x19, or 6x37 class, regular lay, ips, IWRC wire rope, installed according to the rigging guidelines set forth in chart depicted in Figure 5-5

The drawing on the following page, Figure 5-4, (SAME AS FIGURE 4-4) is another illustration of the continuing evolution of Rig Stability System engineering and design. It represents the latest API thinking relative to planing and preparing a Rig Stability System.

CAUTION: SOLE EMPHASIS SHOULD NOT BE PLACED ON PULL TESTING OR ALTERNATIVES TO PULL TESTING AS THIS MEASURES ONLY ONE COMPONENT OF THE RIG STABILITY SYSTEM.

The rig contractor should be responsible for the following: a. Insuring that anchor capacities are verified and that anchor spacing and capacity is suitable for the mast guying pattern and anticipated loading.

b. Records of pull testing or records of other methods used to verify temporary anchor capacity should be retained by the rig contractor until the job is complete and the guy wires have been removed from the anchors. The records should indicate the capacity of each anchor, the date of verification, name and phone number of the party responsible for verification, and the soil condition at the time of verification.

OUT OF AN ABUNDANCE OF CAUTION IT IS EXTREMELY IMPORTANT TO POINT OUT THAT THE PREVENTION OF RIG UPSET IS DIRECTLY DEPENDENT ON THE TOTAL INTEGRITY OF THE RIG STABILIZATION SYSTEM. THE SYSTEM INCLUDES ALL OF ITS COMPONENTS AND IS ONLY AS SOUND AS ITS WEAKEST MEMBER.

Our research has concluded, that the latest State-of-the-Art in RIG STABILIZATION is to be found in the pending American Petroleum Institute, Recommended Practice for MAINTENANCE and USE of DRILLING and WELL SERVICING STRUCTURES.