hhf 1600 mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> manual free sample

‘ancl then locked down to avoid the preset pressure changing.‘Upon builtin installation of the lube oif pump, as shown item 9 in Figure 13, the pump mast be

hhf 1600 mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> manual free sample

F SERIES mud pump . HHF 1600 mud pump (832) HongHua Group ( HH) HHF series mud pump is tough and field proven, is specifically equipped to meet almost any customer requirement. We have provided more than 1000 sets in the world . wide. This is backed by our warranty and field support program. And the HHF 1600 pump is one of the most acceptable and developed mud pump . HHF 1600 mud pump is made of high quality material, according to API 7K specification. And HHF 1600 mud pump is a kind of F series, triplex single acting piston mud pump .

hhf 1600 mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> manual free sample

F SERIES MUD PUMP. HHF 1600 Mud Pump (832) HongHua Group ( HH) HHF series mud pump is tough and field proven, is specifically equipped to meet almost any customer requirement. We have provided more than 1000 sets in the world . wide. This is backed by our warranty and field support program. And the HHF 1600 pump is one of the most acceptable and developed mud pump. HHF 1600 mud pump is made of high quality material, according to API 7K specification. And HHF 1600 mud pump is a kind of F series, triplex single acting piston mud pump. The seal packing, bearing and connection size are exchangeable with EMSCO F 1600 mud pump. Specification Rated input power 1600HP (1193 KW). Rated Stroke 120 SPM. Max. liner Di a. 7 ( mm). Rated Stroke distance 12 ( mm). Gear Ratio: 1. Suction pipe size: 12 ( ), Flanged Discharge pipe size: API 5 1/8 Flanged, 5000psi Max. discharge pressure 5000psi ( Mpa).

1 F SERIES MUD PUMP. HHF 1600 Mud Pump (832) HongHua Group ( HH) HHF series mud pump is tough and field proven, is specifically equipped to meet almost any customer requirement. We have provided more than 1000 sets in the world . wide. This is backed by our warranty and field support program. And the HHF 1600 pump is one of the most acceptable and developed mud pump. HHF 1600 mud pump is made of high quality material, according to API 7K specification. And HHF 1600 mud pump is a kind of F series, triplex single acting piston mud pump. The seal packing, bearing and connection size are exchangeable with EMSCO F 1600 mud pump. Specification Rated input power 1600HP (1193 KW). Rated Stroke 120 SPM. Max. liner Di a. 7 ( mm). Rated Stroke distance 12 ( mm). Gear Ratio: 1. Suction pipe size: 12 ( ), Flanged Discharge pipe size: API 5 1/8 Flanged, 5000psi Max. discharge pressure 5000psi ( Mpa).

2 Max. discharge flow 780 gpm ( L/s). Valve chamber size: API 7 . Lubrication: Forced and splash Discharge flow and pressure: please reference table 1 and table 2. Page 1 of 4. Table 1: Pressure parameter for mud pump HHF 1600 . Diameter of Liner 7 6 6 6 5 5 . Rated pressure 3430 psi 3690 psi 3978 psi 4668 psi 5000 psi 5000 psi (MPa-psi MPa MPa MPa MPa MPa MPa Table 2: Discharge parameter for mud pump HHF 1600 . Discharge capacity Stroke Rated power GPM. (spm). kW HP 7 6 6 6 5 5 . 130 1293 1734 780 725 672 573 481 398. 120* 1193* 1600 * 720 669 621 529 444 367. 110 1094 1467 660 613 569 485 407 337. 100 995 1334 600 558 517 441 370 306. 90 895 1200 540 502 465 397 333 275. 80 796 1067 480 446 414 353 296 245. 70 696 933 420 390 362 308 259 214. 1 - - Notes: as per volumetric efficiency (100%) and mechanical efficiency (90%). 2.* shows rated stroke numbers while operating. page 2 of 4.)

3 Dimension Transport dimension Length 15" 1 ( 4065mm). Width 8" 2 (2505mm). Height 6" 8 (2030mm). Weight ( without damper) 57540 lbs (26100 kg). Page 3 of 4. Equipment scope Mud pump with a liner Damper and safety valve Equipped with Hoister. Completed with spare parts , special tools and fits We also maintain spare parts for you all requirements. Please contact us if you need more information! HongHua , America, LLC. 8300 McHard Road, Houston, TX 77053. Tel : (832) Fax : (832) E mail: sales@hh Website: Page 4 of 4.

hhf 1600 mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> manual free sample

Before installation and operation, the operator should read this manual carefully, and do installation, operation and maintenance according to the instructions in manual. If you do not know the related contents, improper installation, operation or servicing may cause human injury or/ and the equipment damage.

l The operator should read this manual carefully before operating the drilling pump. He can operate or maintain the equipment only when he knows well the functions and operation or maintenance of the equipment.

The housing is a box type weldment of steel plates, after stress relief treatment, rough and finish machining, the housing is formed. It is the base part of drilling pump. All components of drilling pump are installed into it. Oil sump and lubrication oil pipeline are set inside the housing to supply lubrication oil for gear, bearing, crosshead etc. A small lifting device with capacity of 500 kg is installed on housing for lifting liner. 4.1.2 Pinion shaft assembly

The unitized drilling pump includes drilling pump, drive and transmission device, mud charging system, high pressure mud release manifold and big skid.

At a port of the connecting line between the accessory manifold and the relief valve, we connect a bypass line with a valve to the pressure release line (which go back to suction tank) of relief valve, therefore, when we open the valve on the bypass line, the mud pressure can be released from the discharge manifold before disconnecting it for servicing.

Liner spraying device is consisted of spray pump, water tank, spraying manifold etc. Its function is to wash, lubricate and cool liner and piston during mud pump running in order to prolong the service life of liner and piston. The spraying pipe position is shown in Fig. 7.

Safety warning:For any preserved pump, no matter being used at well site or transported from factory, it is necessary to be checked before put into operation. Make sure every part of pump is available and in good condition.

The unitized drilling pump directly driven by diesel engine mainly includes drilling pump, diesel engine, cardan shaft ,V belt drive device etc. the diesel engine can also directly drive V belt transmission device to run drilling pump. The mud charging system is installed alone. The high pressure mud release manifold is connected to drainage port of relief valve and mud is released into mud suction tank.

The drilling pump mainly consists of two portion, power end and fluid end (see Fig. 1). The power end includes pinion shaft, crankshaft, connecting rod, crosshead sliding block device. It can supply power to fluid end and change the rotary motion to reciprocating motion. With the power from the power end, the piston of

For installation and aligning etc of transmission device between pump and power supply, please see the related chapters of operation manual of unitized drilling pump. The following is just for reference.

(1)Release pressure:before doing maintenance work at cylinders, liners, pitons or valves, close the valves on suction line and discharge line, open the bypass valve to mud tank ( see Fig. 17, item 2). Only in this way can the pressure in cylinders be released, and avoid danger at opening valve pot cover and dismantling liner.

The left and right sides of this pump are determined by looking from the power end to the fluid end. This way is also used for determining the left, middle and right sides of equipments such as crosshead, cylinder etc.

Install the pump on the structural member base of drilling boat or drilling platform. Shown in Fig.13 and 14, when fix pump skid with bolts, it is a must to place mats under skid for avoiding any distortion and deflection resulted to power end frame. Note, it needs full padding of pump skid before tightening skid for avoiding extra stress resulted to pump when tightening bolts. The mat’s width is required to be not less than the width of runner flange of skid. Its length is not less than 12″ (305mm). When integral installation is adopted for power unit or electric motor to pump skid, the pump must be fixed on the skid of the t-beam with retention blocks rather than bolts. In this way, the drilling pump could be a bit “float” so as to reduce the possible deformation of the pump frame caused by the deformation of barge deck or platform.

This manual generally describes the technical specifications and performance parameters, drive principle, configuration, installation and adjustment, operation and maintenance, frequent failure and troubleshooting, replacement of consumable and other operational precautions etc.

HHF-1300/1600 drilling pump is a horizontal, triplex, single action piston pump. As an important equipment for drilling operation, it feeds and circulates the high-pressure drilling fluid, which flushes the well bottom and crushes rocks, cools and lubricates drill- bit, and then carries cuttings (rock chips) return to the surface.

10.1.2.5 Water baffle should be installed on crosshead extension rod before starting drilling pump. 10.1.2.6 The liner end cap (cover) should be installed before starting drilling pump

driven by the big gear ring of drilling pump. It is a must that the side of drive gear of oil pump and the side of big gear ring of drilling pump should be aligned. the mesh clearance (backlash) should be 0.0236″~ 0.0354″(0.60~0.90mm).

Each pump has a serial number, customers need to point out specially the model and serial number when they order spare parts and inquire about the equipment.

5.2.1 Pressure lubrication with “built-in” oil pump As shown in Fig.10,install the oil pump in the chamber of frame, and the drive gear of oil pump is

For ensuring the normal operation of lubrication oil pump, the rotary direction of oil pump is shown in Fig. 10. For ensuring the lowest oil-supplying pressure of lubrication oil pump to be 5 psi (0.035MPa), the lowest stroke number of drilling pump should not be less than 25 SPM.

10.1.4.5 Watch the change for lubrication pressure, water supply of spraying pump and pump discharge pressure. If any abnormity exists, inspect and repair them timely.

12 Drilling pump servicing...................................................................................................................... 28 12.1 Fluid power end dismantling ...................................................................................................... 28 12.2 Main parts’ assembling of fluid end ............................................................................................ 30 12.3 Dismantling of power end .......................................................................................................... 32 12.4 Assembling the main parts of power end..................................................................................... 33 12.5 Replacement of air bag of discharge dampener........................................................................... 37

10.1.1.4 Check if all valves of mud pipelines are at “on” or “off” positions before starting. 10.1.1.5 Check if the inflating pressure of discharge dampener reaches the specified value ≤4.5MPa (650psi). Caution:Only nitrogen or air can be inflated into the bladder of discharge dampener. Flammable or explosive gas such as oxygen and hydrogen are strictly forbidden. 10.1.1.6 Check if the relief valve and pressure gauge are complete and sensitive, and if the preset of relief valves is correct.

fluid end do reciprocating motion in liner and work together with suction valve and discharge valve to compress low pressure mud and discharge high pressure mud.

1. Inflating connector blocked 2. Air bladder is broken 3. The needle valve with bad sealing performance 1.Discharge filter and discharge line blocked 2. Relief valve wrong setting, mud pump overload

Safety warning:When any of mechanical and electric parts of drilling pump are running, all safety device should be in normal and effective status, include protection of AC VF motor for cooling blower faults accidently, pressure alarm of lubrication system, motor power-off protection of mud charging system. The matching between the relief valve’s limiting pressure and liner diameter, the discharge dampener inflating pressure and the related requirements etc should be checked and confirmed every shift.

10.1.2.2 The liner spray pump can be started in advance or together with drilling pump. It is forbidden to start drilling pump earlier than spray pump starting at any time. For spraying lubrication of liner and piston, spraying system should adopt different coolants under different drilling conditions. Note: if water is the basic fluid content for coolants, preservatives (such as emulsified oil or motor oil)should be added in it for corrosion protection of parts.

There is a recommended spare parts list attached to this manual for part ordering reference, if the needed parts exceed the items listed, please consult the parts list of HHF-1300/1600.

The lubrication oil pump has two installation modes of “Built-in mode” and “outside mode” for user to choose. If the user does not request specially, the mode “built-in” shall be used generally, no matter what mode adopted, the internal lubrication piping is same.

10.1.3.2 Natural suction operation-when the pump is running under natural suction condition, the pump speed is limited by the filling degree of pump. If some mental knocking sound can be heard from the fluid end while running,it means that pump has been cavitated and not fully- filled. At this moment, the charging pump should be started until the knocking sound disappeared and operation turn to normal, then the natural suction can be adopted again.

HHF-1300/1600 drilling pump is one of the most important equipments for rig for middle and deep depth well drilling. The parts and components of this drilling pump are designed and manufactured according to API 7K and relevant standards. It can satisfy the technological requirements for well drilling.

crosshead and guide to meet requirements. (2)Turn the crosshead 180° when replace the guide or disassemble the crankshaft assembly. (3)Recommend to overhaul the drilling pump every 2-3 years, inspect the main bearing, eccentric

10.1.3.4 The pressure of mud discharge pressure gauge should be watched very carefully at pump starting. Before the mud return to ground, the operator is not allowed to leave.

The drilling pump’s pressure lubrication system is shown in Fig. 9. In this system,through the connector holder II, the oil pump sends oil to pinion shaft nozzle, main bearing oil pipe and crosshead chamber connector holder I,then through connector seat I distribute oil to crosshead, crosshead bearing and crosshead extension rod.

The drilling pump can adopt natural suction or charging suction. The pipeline for natural suction should be short and the shorter the better. It is the best that it has no elbow. The size of pipeline should be the same as that of pump suction port at least ( it should be bigger if it is longer than 6 feet). The pipelines for charging suction can be made to be any bending shape needed. And the charging pump should have bypass pipeline. The drilling pump can keep working in a natural suction way once the charging pump fails or is in servicing.

Ambient temperature -20°F~+40°F (-29°C~+4°C) AGMA 250.04EP(4EP)or ASTM/ISO VG150 Oil sump Capacity:HHF-1300 pump :100US gal(379L).HHF-1600 pump :100gal(379L)

The drilling pump adopts bimetallic liner. Liners with different diameters can be selected according to different drilling conditions. The liner is fixed on cylinder block with bolts through liner thread ring and liner lock. The liner and piston and piston rod can be lift and put in or taken out from the opening on the top of frame with the help of small lifting device mounted on frame.

The unitized drilling pump consists of drilling pump, power drive device, mud suction system, mud discharge system, is installed on the same skid and transported as a module. Since the unitized drilling pump has been installed and tested as per design requirements at manufacturer’s factory, the user needs only to install according to the requirements of drilling well site layout.

(102mm×305mm) should be placed at several positions under pump skid along the entire length. The foundation below mats should be 12″(305mm)wider than the width of the pump skid.

10.1.2.1 It is a must to start electric lubrication oil pump before starting drilling pump. Make sure that gears and crosshead of power end get fully lubricated before starting.

1 Big skid of unitized mud pump 2 Motor 3 Gear oil pump 4 Pressure switch 5 Suction filter 6 Magnetic filter 7 Oil distributor 8 Drilling pump 9 Oil pressure gauge

10.1.2.4 Before the drilling pump starting, ensure to top up cylinders and discharge manifold of fluid end fully. Because air inside pumps can not be exhausted completely under conditions with pressure, so it will seriously affect the stabilization of pump running and the service life of pistons and valves. The way to top up pump is: open the pressure-release line or mud gun line, start pump to run until the air inside being exhausted completely.

(2)Check Belt pulley centers’ alignment Check the belt pulley’s alignment after installing and tensioning V belt. It is required to make two belt pulley’s end faces coplanarity, allowable error not bigger than 2mm. 9.2.3.2 Chain transmission (1)Check Chain wheel’s alignment Check the sprocket’s alignment after installation. It is required to make two chain wheels’ end faces coplanarity, allowable error not bigger than 2mm. After the chain wheel installation meet requirements, install the chain. (2)Lubrication of transmission chain As an independent system, in chain transmission device of drilling pump, chain lubrication system

The welded suction desurger should be installed in front of all valves in suction line. The flange type suction desurger should be connected directly to inlet flange of pump suction manifold.

Fig. 17 Accessory manifold and pressure release line (2)Dismantle the discharge manifold and discharge line. (3)Dismantle the connecting bolts for suction manifold and cylinder block . (4)Dismantle the connecting nuts between cylinder block and frame, then can the cylinder block module be removed. Caution:There is no need to dismantle the suction module, unless the suction manifold needs to be replaced. Replace the gasket ring or seal ring together while suction manifold or cylinder block module being replaced . 12.1.2 Piston and liner (1)Cranking :crank the pump and make the crosshead at proper position. (2) Dismantle the connection clamp between piston rod and extension rod, and crank mud pump to separate the extension rod from piston rod. Then use the lifting tool to hold liner inside, use the lifting device equipped on pump to hang the liner, and use a hammer to knock the liner lock loose, and finally lift out the liner and piton from frame top. (3)There is no need to remove piston core from piston rod when replacing piston rubber. Replacing the rubber only needs to remove the retainer (circlip) and clamping plate at the front of piston core. (4)Piston and piston core seal:screw off the piston rod locknut and dismantle the piston. A self-tightening seal ring is set between piston core and piston rod shoulder, normally it is durable, no need to replace.

Note: when change liner, the liner seal should be replaced together. (3)Inspect the liner chamber of mud pump frame, clean it if there is too much mud sediment. (4)Inspect whether there is sufficient water in water tank for spraying pump or not, whether the cooling water is polluted or not, supplement water or change water and clean water tank in time if necessary. (5)Check the charging pressure of discharge pulsation dampener. (6)Inspect the reliability of the shear relief valve. (7)Loosen the piston rod clamp, turn the piston for a quarter cycle manually, tighten the clamp again. This can make the piston wear evenly and extend the service life of piston and liner. (8)Check the valve pot cover and cylinder head every 4 hours for looseness . (9)Observe the valve pot seal, liner seal and liner seal leakage hole, if mud is seen to flow out, please replace related seal timely.

1. Mud gauge pressure drops, mud discharge decreases or no mud discharge at all 2. Mud discharge unevenly, pressure fluctuate badly, metal knocking sound in cylinder 3. Suction manifold has abnormal sound.

10.1.1.2 Open the top view hole cap of pump, add enough lubrication oil into pinion bearing oil groove and crosshead oil groove to ensure sufficient lubrication of all friction surfaces before operation.

The discharge filter shall be installed at the other side of discharge manifold. The discharging mud go to the drilling fluid line (manifold) after filtering.

mud inside valve pot and liner should be drained completely and washed cleanly before storage. Lift up the fluid end,make pump tilting to power end, drain all the oil inside oil groove and oil sump, then wash them completely. After that, remove the screw plug of oil sump, install an elbow of 90° with mouth down, put on an wire net for air ventilation and preventing vapor condensation.

10.1.1.1 Check if every part of the unitized drilling pump and pump itself are connected, installed and tightened according to relevant requirements, and check if there is any foreign matter exist in pump body or frame.

The compound transmission drives drilling pump through air tube clutch and cardan shaft. The mud charging system is installed alone. The high pressure mud release manifold is connected to drainage port of relief valve and mud is released into mud suction tank.

9 Drilling pump installation..................................................................................................................... 17 9.1 Installation foundation................................................................................................................. 17 9.2 Installation ................................................................................................................................... 18

It is necessary to install a suction filter in natural suction pipeline. And a suction filter should be set in front of charging pump for charging suction.

Assemble the valve body and valve rubber into a module with the clamping plate and retainer. After confirming no scoring and burr on valve seat external cone surface and clean, put the valve seat into the cleaned seat cone hole on cylinder block (pump deck).

Safety warning 2:when high pressure mud manifold system needs to be maintained, it is a must to open the bypass valve on pressure release line and release the high pressure of discharge manifold to zero, then dismantle and repair .

10.1.3.6 The pressure of lubrication system should be 0.035~0.103MPa.(5-15psi) after mud pump starting, and the oil level should meet requirements. After starting, check the oil level if it is below the lowest mark, add oil immediately.

Fig. 12 Pressure lubrication with electrical oil pump As shown in Fig. 12,the electrical motor drives the gear oil pump to run, and supply pressure lubrication oil to drilling pump. Attention:Before starting the drilling pump, it is a must to start electrical lubrication oil pump first to ensure full lubrication of all mechanical movement parts before work. 5.2.4 Lubrication oil type We recommend strongly that, you prefer to adopt extreme pressure (EP), non-corrosive and anti-foaming gear oil as follows: Ambient temperature +30°F~+155°F (-1°C~+68°C) AGMA 250.04EP(6EP)or ASTM/ISO VG320 Ambient temperature 0°F~+80°F (-18°C~+27°C) AGMA 250.04EP(5EP)or ASTM/ISO VG220

10.1.3.5 When the pump is pressure lubricated by built-in mode or mechanical transmission mode, for ensuring full lubrication of power end, the pump speed can’t be too low, i.e. the pump stroke can’t be lower than 25 SPM.

Replace the bladder of discharge pulsation dampener as per the following steps:( see Fig. 22) 12.5.1 Confirm the system pressure has been released completely ( as described before ). 12.5.2 Dismantle the cover 5, and insert a wood rod between the bladder and shell body. After flattening the bladder, then take it out from the top. 12.5.3 Check if the air bladder and the bottom plug are in good condition. Replace them with new one if damaged. 12.5.4 When installing a new air bladder, first flatten it and curl it up to spiral shape to make it can be put in from the top of the shell. After that, loosen and adjust the air bladder to make it contact the shell body properly, finally install the seal ring of the air bladder neck to the sealing shoulder of shell and coat some lubrication grease on the internal of the neck. 12.5.5 Install the cover 5, be sure not to make the air bladder neck deformed. 12.5.6 Tighten the nuts(R2)with pre-tighten torque of 1954~2255N.m. 12.5.7 Inflate the air bladder as per the requirement of clause 10.1.1.5 of this manual.

The gears, bearings, crosshead sliding ways of power end all adopt the combination of splash lubrication mode and forced lubrication mode. And the forced lubrication includes built-in mode and outer layout mode. The liners and pistons of fluid end are lubricated, flushed and cooled with the water supplied by spray pump.

10.1.3.3 Charging suction running: before starting the charging pump, if the diaphragm desurger is used, the tyre air inflating device should be sued to charge air for suction desurger. The air charging pressure is 0.1MPa.(15 pond /inch2). The diaphragm fluctuating range should be at observation window bottom or middle point.

10.1.3.1 Start with slow speed-the starting speed should be as low as possible, then speed up step by step. Ensure that fluid flowing speed inside suction pipeline can meet the pump suction action without any cavitation corrosion.

13 Special tools along with HHF-1300/1600 drilling pump delivery .................................................... 38 14 Spare parts along with HHF-1300/1600 drilling pump delivery ........................................................ 39 15 Recommended spare parts list ............................................................................................................ 40 16 Configuration content of a single pump ............................................................................................. 42

(2)Inspect the working condition of liner and piston, a little mud leakage is allowable. If leakage is huge, it needs to inspect the abrasion of piston and liner inner hole. If the mud leakage excesses normal limit, the liner and piston should be replaced.

2.1 Use and application ....................................................................................................................... 2 2.2 Referenced tandards ...................................................................................................................... 2 2.3 Brief working principle ................................................................................................................. 2 2.4 Technical parameters ..................................................................................................................... 3 2.5 Performance parameters ................................................................................................................ 4 3 General configuration ............................................................................................................................. 4 3.1 General structure ........................................................................................................................... 4 3.2 Overall dimensions........................................................................................................................ 5 4 Introductions of main components ......................................................................................................... 6 4.1 Power end ........................................................................................................................................ 6 4.2 Fluid end .......................................................................................................................................... 8 5 Lubrication ........................................................................................................................................... 11 5.1 Splashing Lubrication.................................................................................................................. 11 5.2 Pressure Lubrication.................................................................................................................... 12 6 Unitized drilling pump.......................................................................................................................... 16 6.1 Diesel engine direct driven Drilling pump .................................................................................. 16 6.2 Compound transmission driven drilling pump ............................................................................ 16 6.3 Motor driven drilling pump ......................................................................................................... 16 7 Mud suction system .............................................................................................................................. 16 7.1 Suction pipeline (manifold)......................................................................................................... 16 7.2 Suction desurger .......................................................................................................................... 16 7.3 Suction filter ................................................................................................................................ 17 7.4 Valves on suction line.................................................................................................................. 17 8 Mud discharge System.......................................................................................................................... 17 8.1 Accessory manifold ..................................................................................................................... 17 8.2 Relief valve.................................................................................................................................. 17 8.3 Pressure release line .................................................................................................................... 17 8.4 Discharge filter ............................................................................................................................ 17

The motor directly drives V belt or chain transmission device,and then drive drilling pump. The mud charging system and pump are installed on the big skid. The high pressure mud release manifold is connected to drainage port of relief valve and mud is released into mud suction tank.

at the side of the pump, and the water tank is installed below the frame, and the spraying pipe is fixed on frame above liner. The spraying water jetted out from spraying pipe onto liner and piston for washing, lubricating and cooling.

For ensuring lubrication oil of power end can be distributed properly while pump is running, the pump on foundation should be adjusted to be horizontal.

The relief valve shall be installed in front of the shut-off valve to prevent pump damage from suddenly starting while the shut-off valve is closed. The release line of relief valve can only be guided into mud suction tank. It can’t be connected to mud suction line.

10.1.2.3 Charge pump can be started in advance or together with drilling pump. It is forbidden to start drilling pump earlier than charge pump starting at any time.

Fig. 11 Pressure lubrication with mechanical driven oil pump As shown in Fig. 11,the pinion shaft drives the gear oil pump to run through v belt, and supply pressure lube for drilling pump lubrication.

The splash lubrication system of drilling pump is independent to the pressure lubrication system. In splash lubrication system,the big gear ring brings oil up from oil sump, after the oiled big and small gears are meshed, the oil is squeezed out and splashed into each oil channel on frame to lubricate pinion gear shaft bearing and crosshead bearing and guide plate.(See Fig. 8)

Safety warning:The power supply should be cut off and tag out while fixing and maintaining. Safety warning:Before the mud discharge manifold needs to be repaired, the bypass valve on pressure release line should be opened first, and let the pressure in discharge manifold to be released to zero.

1 suction oil filter 2 connector holderⅡ 3 oil pipe 3A pinion shaft nozzle 4 main bearing tubing 4A crosshead chamber connector holder I 5 pressure gauge 6 relief valve 7 oil channel 8 oil pipe 9 oil pump

hhf 1600 mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> manual free sample

A wide variety of liners mud pump options are available to you, such as 1 year, not available and 2 years.You can also choose from new, used liners mud pump,as well as from energy & mining, construction works , and machinery repair shops liners mud pump, and whether liners mud pump is 1.5 years, 6 months, or unavailable.

hhf 1600 mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> manual free sample

The NOV FC-1600 Triplex Mud Pump is made of rugged Fabriform construction and designed for optimum performance under extreme drilling conditions. It is compact and occupies less space, yet delivers unequaled performance. The pumps are backed by several decades of design and manufacturing experience, and are considered leaders in the field.

NOV FC-1600 Triplex Mud Pump is conservatively rated at relatively low rpm. This reduces the number of load reversals in heavily stressed components and increases the life of the fluid end parts through conservative speeds and valve operation.

The NOV FC-1600 Triplex Mud Pump design provides an inherently balanced assembly. No additional counterbalancing is required for smooth operation. No inertia forces are transmitted to the pumps’ mountings.

A Triplex Mud Pump sometimes referred to as a drilling mud pump or mud drilling pump. NOV FC-1600 Triplex Mud Pump is a reciprocating piston/plunger pump designed to circulate drilling fluid under high pressure (up to 7,500 psi) down the drill string and back up the annulus. A mud pump is an important part of the equipment used for oil well drilling.