what is a mud pump free sample
The 2,200-hp mud pump for offshore applications is a single-acting reciprocating triplex mud pump designed for high fluid flow rates, even at low operating speeds, and with a long stroke design. These features reduce the number of load reversals in critical components and increase the life of fluid end parts.
The pump’s critical components are strategically placed to make maintenance and inspection far easier and safer. The two-piece, quick-release piston rod lets you remove the piston without disturbing the liner, minimizing downtime when you’re replacing fluid parts.
Created specifically for drilling equipment inspectors and others in the oil and gas industry, the Oil Rig Mud Pump Inspection app allows you to easily document the status and safety of your oil rigs using just a mobile device. Quickly resolve any damage or needed maintenance with photos and GPS locations and sync to the cloud for easy access. The app is completely customizable to fit your inspection needs and works even without an internet signal.Try Template
Fulcrum helps us improve our processes and make our work environment safer by streamlining inspections, surfacing inspection-related insights, and managing follow-up actions. Once you close the loop from action to insight to further action, the possibilities are limitless.
Fulcrum lets employees on the floor who actually are building the product take ownership. Everyone’s got a smartphone. So now they see an issue and report it so it can be fixed, instead of just ignoring it because that’s the way it’s always been done.
One of the big things you can’t really measure is buy-in from employees in the field. People that didn’t want to go away from pen and paper and the old way of doing things now come to us and have ideas for apps.
Easy to custom make data collection forms specific to my needs. Very flexible and I can add or adjust data collection information when I need it. The inclusion of metadata saves a lot of time.
It is so easy to use. You don"t have to be a GIS specialist or coder to set up the app. Just a regular person is able to set up their own app and use it.
Fulcrum is, without a doubt, the best thing I"ve done for my business in regards to cost saving and time efficiency. Support is very good and help, on the rare occasions it"s required, is never far away.
I’ve run into several instances of insufficient suction stabilization on rigs where a “standpipe” is installed off the suction manifold. The thought behind this design was to create a gas-over-fluid column for the reciprocating pump and eliminate cavitation.
When the standpipe is installed on the suction manifold’s deadhead side, there’s little opportunity to get fluid into all the cylinders to prevent cavitation. Also, the reciprocating pump and charge pump are not isolated.
The gas over fluid internal systems has limitations too. The standpipe loses compression due to gas being consumed by the drilling fluid. In the absence of gas, the standpipe becomes virtually defunct because gravity (14.7 psi) is the only force driving the cylinders’ fluid. Also, gas is rarely replenished or charged in the standpipe.
Installing a suction stabilizer from the suction manifold port supports the manifold’s capacity to pull adequate fluid and eliminates the chance of manifold fluid deficiency, which ultimately prevents cavitation.
Another benefit of installing a suction stabilizer is eliminating the negative energies in fluids caused by the water hammer effect from valves quickly closing and opening.
The suction stabilizer’s compressible feature is designed to absorb the negative energies and promote smooth fluid flow. As a result, pump isolation is achieved between the charge pump and the reciprocating pump.
The isolation eliminates pump chatter, and because the reciprocating pump’s negative energies never reach the charge pump, the pump’s expendable life is extended.
Investing in suction stabilizers will ensure your pumps operate consistently and efficiently. They can also prevent most challenges related to pressure surges or pulsations in the most difficult piping environments.
Sigma Drilling Technologies’ Charge Free Suction Stabilizer is recommended for installation. If rigs have gas-charged cartridges installed in the suction stabilizers on the rig, another suggested upgrade is the Charge Free Conversion Kits.
Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the weather conditions identified in Chapter 13, “Energy Conservation” of the 1996 BOCA Building Code and supplemented by the “Building Code Rules”. All HVAC equipment shall be commercial or light industrial grade. If new construction it shall be installed at grade or within mechanical rooms for easy access and maintenance. If existing construction, roof mounted equipment will be considered after all other options have been exhausted, including the elimination of noise and vibration transfer to the structural members. The HVAC systems shall be zoned, with units sized and placed as required by heating and cooling loads on the building. Zoning of systems is dependent on the size, shape and orientation of the building. The HVAC system shall be divided into a minimum of 4 exterior and 1 interior temperature control zones. Return air shall be taken from the area supplied or adjacent to the area in the same temperature control zone. The ventilation and exhaust system shall be sized to maintain a positive pressure throughout the building envelope to limit air and dust infiltration. No HVAC ductwork shall be installed under the floor slab or underground.
Smoke Detectors At Owner"s expense, smoke detectors will be installed on the Property in working condition in accordance with the law prior to the tenant"s occupancy. During the occupancy, it shall be the tenant"s responsibility to maintain all smoke detectors. Owner will replace smoke detector equipment as needed.
Fuel 28.1 The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 including GST per litre (which includes a service component).
Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.
Rubric The rubrics are a scoring tool used for the Educator’s self-assessment, the formative assessment, the formative evaluation and the summative evaluation. The districts may use either the rubrics provided by ESE or comparably rigorous and comprehensive rubrics developed or adopted by the district and reviewed by ESE.
Weapons Possession of any weapon or ammunition is prohibited. This includes but is not limited to guns, swords and knives with the blade over five and a half inches. Possession of facsimile weapons is also prohibited. This includes but is not limited to pellet guns, air soft pistols and B.B. guns. Serious injury has occurred in situations where facsimile weapons have been mistaken for actual weapons.
Heating and Air Conditioning During the normal business hours of 7:00 a.m. to 6:00 p.m., Monday through Friday, and 8:00 a.m. to 12:00 noon on Saturday, Landlord shall furnish heating and air conditioning to provide a comfortable temperature, in Landlord"s judgment, for normal business operations, except to the extent Tenant installs additional equipment which adversely affects the temperature maintained by the air conditioning system. Landlord acknowledges that Tenant is in the business of providing software development and services and therefore stipulates that normal business operations include the use of computer hardware and devices necessary for its business. If Tenant installs such additional equipment not necessary for its normal business operations, Landlord may install supplementary air conditioning units in the Premises, and Tenant shall pay to Landlord upon demand as Additional Rent the cost of installation, operation and maintenance thereof. Landlord shall furnish heating and air conditioning after business hours if Tenant provides Landlord reasonable prior written notice, and pays Landlord all charges for such additional heating or air conditioning, to be billed at $25.00 per hour.
Weighing and Scaling Costs Purchaser agrees to pay for all weighing costs for logs delivered regardless if logs are purchased on a weight or scale basis. In addition, Purchaser agrees to pay for all scaling costs for logs delivered on a scale basis. Purchaser also agrees to pay for all costs associated with the transmission and reporting of scale or weight data.
Prescription Safety Glasses Prescription safety glasses will be furnished by the employer. The employer retains the authority to establish reasonable rules and procedures regarding frequency of issue, replacement of damaged glasses, limits on reimbursement costs and coordination with the employer’s vision plan.
Loop Makeup Response Time - Electronic This report measures the average interval and the percent within the interval from the electronic submission of a Loop Makeup Service Inquiry (LMUSI) to the distribution of Loop Makeup information back to the CLEC. Exclusions Manually submitted inquiries Canceled Requests Business Rules The response interval starts when the CLEC’s Mechanized Loop Makeup Service Inquiry (LMUSI) is submitted electronically through the Operational Support Systems interface, TAG. It ends when BellSouth’s Loop Facility Assignment and Control System (LFACS) responds electronically to the CLEC with the requested Loop Makeup data via the TAG Interface. LSRs submitted via LENs will be reflected in the results for the TAG interface.
There are many different ways to drill a domestic water well. One is what we call the “mud rotary” method. Whether or not this is the desired and/or best method for drilling your well is something more fully explained in this brief summary.
One advantage of drilling with compressed air is that it can tell you when you have encountered groundwater and gives you an indication how much water the borehole is producing. When drilling with water using the mud rotary method, the driller must rely on his interpretation of the borehole cuttings and any changes he can observe in the recirculating fluid. Mud rotary drillers can also use borehole geophysical tools to interpret which zones might be productive enough for your water well.
The mud rotary well drilling method is considered a closed-loop system. That is, the mud is cleaned of its cuttings and then is recirculated back down the borehole. Referring to this drilling method as “mud” is a misnomer, but it is one that has stuck with the industry for many years and most people understand what the term actually means.
The water is carefully mixed with a product that should not be called mud because it is a highly refined and formulated clay product—bentonite. It is added, mixed, and carefully monitored throughout the well drilling process.
The purpose of using a bentonite additive to the water is to form a thin film on the walls of the borehole to seal it and prevent water losses while drilling. This film also helps support the borehole wall from sluffing or caving in because of the hydraulic pressure of the bentonite mixture pressing against it. The objective of the fluid mixture is to carry cuttings from the bottom of the borehole up to the surface, where they drop out or are filtered out of the fluid, so it can be pumped back down the borehole again.
When using the mud rotary method, the driller must have a sump, a tank, or a small pond to hold a few thousand gallons of recirculating fluid. If they can’t dig sumps or small ponds, they must have a mud processing piece of equipment that mechanically screens and removes the sands and gravels from the mixture. This device is called a “shale shaker.”
The fluid mixture must have a gel strength sufficient to support marble-size gravels and sand to the surface when the fluid is moving. Once the cuttings have been carried to the surface and the velocity of the fluid allowed to slow down, the fluid is designed to allow the sand and gravel to drop out.
The driller does not want to pump fine sand through the pump and back down the borehole. To avoid that, the shale shaker uses vibrating screens of various sizes and desanding cones to drop the sand out of the fluid as it flows through the shaker—so that the fluid can be used again.
When the borehole has reached the desired depth and there is evidence that the formation it has penetrated will yield enough water, then it’s time to make the borehole into a well.
Before the well casing and screens are lowered into the borehole, the recirculating fluid is slowly thinned out by adding fresh water as the fluid no longer needs to support sand and gravel. The driller will typically circulate the drilling from the bottom up the borehole while adding clear water to thin down the viscosity or thickness of the fluid. Once the fluid is sufficiently thinned, the casing and screens are installed and the annular space is gravel packed.
Gravel pack installed between the borehole walls and the outside of the well casing acts like a filter to keep sand out and maintain the borehole walls over time. During gravel packing of the well, the thin layer of bentonite clay that kept the borehole wall from leaking drilling fluid water out of the recirculating system now keeps the formation water from entering the well.
This is where well development is performed to remove the thin bentonite layer or “wall cake” that was left behind. Various methods are used to remove the wall cake and develop the well to its maximum productivity.
Some drillers use compressed air to blow off the well, starting at the first screened interval and slowly working their way to the bottom—blowing off all the water standing above the drill pipe and allowing it to recover, and repeating this until the water blown from the well is free of sand and relatively clean. If after repeated cycles of airlift pumping and recovery the driller cannot find any sand in the water, it is time to install a well development pump.
Additional development of the well can be done with a development pump that may be of a higher capacity than what the final installation pump will be. Just as with cycles of airlift pumping of the well, the development pump will be cycled at different flow rates until the maximum capacity of the well can be determined. If the development pump can be operated briefly at a flow rate 50% greater than the permanent pump, the well should not pump sand.
Mud rotary well drillers for decades have found ways to make this particular system work to drill and construct domestic water wells. In some areas, it’s the ideal method to use because of the geologic formations there, while other areas of the country favor air rotary methods.
Some drilling rigs are equipped to drill using either method, so the contractor must make the decision as to which method works best in your area, for your well, and at your point in time.
To learn more about the difference between mud rotary drilling and air rotary drilling, click the video below. The video is part of our “NGWA: Industry Connected” YouTube series:
Gary Hix is a Registered Professional Geologist in Arizona, specializing in hydrogeology. He was the 2019 William A. McEllhiney Distinguished Lecturer for The Groundwater Foundation. He is a former licensed water well drilling contractor and remains actively involved in the National Ground Water Association and Arizona Water Well Association.
To learn more about Gary’s work, go to In2Wells.com. His eBooks, “Domestic Water Wells in Arizona: A Guide for Realtors and Mortgage Lenders” and “Shared Water Wells in Arizona,” are available on Amazon.
Instead of using paper checklists when out in the field, drilling contractors and rig inspection services can generate a new inspection form from anywhere and the results are saved electronically.
Specifically designed for drilling companies and others in the oil and gas industry, the easy to use drilling rig inspections app makes it easy to log information about the drill rigs, including details about the drill rigs operators, miles logged and well numbers. The inspection form app covers everything from the mud pump areas and mud mixing area to the mud tanks and pits, making it easy to identify areas where preventative maintenance is needed. The drilling rig equipment checklist also covers health and safety issues, including the availability of PPE equipment, emergency response and preparedness processes, and other critical elements of the drilling process and drill press equipment.
This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.
We are committed to total customer satisfaction, achieving excellence in our operations through continuous improvement, development and empowerment of our people, and providing a positive contribution to our community.
The global mud pumps market is projected to grow at a CAGR of 8.0% during the forecast period. As per the mud pumps market research report, the global market for mud pumps is projected to grow swiftly. According to analysts, the increased demand for directional and horizontal drilling as well as a number of new oil discoveries will drive the market growth during the forecast period. The mud pumps market research report offers a comprehensive analysis of the global mud pumps market and its type, applications, and components segments. The high cost of drilling along with changing government regulations are the elements that could influence the mud pumps market advancement throughout the forecast period. The mud pumps market research report by expert analysts is developed to assist organizations in the mud pumps market.
The global mud pumps market has been segmented based on type, applications, and components. On the basis of type, the market for mud pumps is segmented based on duplex and triplex pumps. Additionally, the market on the basis of applications, is segmented into the oil and gas industry and building industry. The global market for mud pumps is also covered based on the components segment which is further split into fluid end and power end.
Major elements such as environmental risks could obstruct the mud pumps market growth. However, according to the mud pumps market research report, higher pressure handling capabilities along with developed infrastructure will propel growth throughout the forecast period. The mud pumps market is set to register growth at a high CAGR owing to these key factors. The exploration of type, applications, and components segments along with regional markets has been given in the global mud pumps market research report. The research analysts studying the mud pumps market have put out market forecasts in the mud pumps market research report in order to support mud pumps market-based companies. The mud pumps market research report provides an extensive understanding of the mud pumps market based on the information and forecasts till 2023.
North America, Europe, Asia Pacific and the rest of the world regional market for mud pumps are predominantly covered in the global mud pumps market research report. Country-level mud pumps markets spread across North America – the United States, Canada, and Mexico are also covered in the report. In South America – Brazil and other country-level mud pumps markets are covered in the report. In Asia-Pacific (APAC) region, the country-level mud pumps markets covered are Japan, India, China, and others. The mud pumps market research report also explores the regional market for mud pumps present in Europe in the United Kingdom, France, Italy, Spain, and Germany, etc. The mud pumps market research report also covers regional markets from the rest of the world alongside mud pumps markets of Africa and the Middle East.
Innovation in technology and companies enhancing production capacities are presumed to drive the mud pumps market growth worldwide. The global mud pumps market could be challenged by unfavorable policies, nevertheless, organizations in the mud pumps market will carry the growth rate forward. The mud pumps market research report presents company profiles of major companies active in the mud pumps market globally. Furthermore, the global mud pumps market report offers an all-inclusive analysis of the market collected from the mud pumps market’s primary and secondary sources covering both decision makers and thought leaders. The mud pumps market research report highlights such key areas assisting businesses operating in the mud pumps market to build better growth strategies.
Managed pressure boiling (MPD) in formations with limited pressure windows has become an approved standard for drilling wells. While MPD is the only option for some wells to perform, the improved success rate for other wells, reduced nonproductive time (NPT) and improved barrier management provided by MPD are also beneficial. MPD operations usually require, at a minimum, a turning control unit (RCD or ACD), a shock collector and a metering speed device. A buffer multiplier, back pressure pump and diversion controls may be additional to the device.
At Market Research Future (MRFR), we enable our customers to unravel the complexity of various industries through our Cooked Research Report (CRR), Half-Cooked Research Reports (HCRR), Raw Research Reports (3R), Continuous-Feed Research (CFR), and Market Research & Consulting Edibles.
MRFR team have supreme objective to provide the optimum quality market research and intelligence services to our clients. Our market research studies by products, services, technologies, applications, end users, and market players for global, regional, and country level market segments, enable our clients to see more, know more, and do more, which help to answer all their most important questions.
In order to stay updated with technology and work process of the industry, MRFR often plans & conducts meet with the industry experts and industrial visits for its research analyst members.
This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.
A mud pump (sometimes referred to as a mud drilling pump or drilling mud pump), is a reciprocating piston/plunger pump designed to circulate drilling fluid under high pressure (up to 7,500 psi or 52,000 kPa) down the drill string and back up the annulus. A mud pump is an important part of the equipment used for oil well drilling.
Mud pumps can be divided into single-acting pump and double-acting pump according to the completion times of the suction and drainage acting in one cycle of the piston"s reciprocating motion.
Mud pumps come in a variety of sizes and configurations but for the typical petroleum drilling rig, the triplex (three piston/plunger) mud pump is used. Duplex mud pumps (two piston/plungers) have generally been replaced by the triplex pump, but are still common in developing countries. Two later developments are the hex pump with six vertical pistons/plungers, and various quintuplexes with five horizontal piston/plungers. The advantages that these new pumps have over convention triplex pumps is a lower mud noise which assists with better measurement while drilling (MWD) and logging while drilling (LWD) decoding.
The fluid end produces the pumping process with valves, pistons, and liners. Because these components are high-wear items, modern pumps are designed to allow quick replacement of these parts.
To reduce severe vibration caused by the pumping process, these pumps incorporate both a suction and discharge pulsation dampener. These are connected to the inlet and outlet of the fluid end.
The power end converts the rotation of the drive shaft to the reciprocating motion of the pistons. In most cases a crosshead crank gear is used for this.
Displacement is calculated as discharged liters per minute. It is related to the drilling hole diameter and the return speed of drilling fluid from the bottom of the hole, i.e. the larger the diameter of drilling hole, the larger the desired displacement. The return speed of drilling fluid should wash away the debris and rock powder cut by the drill from the bottom of the hole in a timely manner, and reliably carry them to the earth"s surface. When drilling geological core, the speed is generally in range of 0.4 to 1.0 m^3/min.
The pressure of the pump depends on the depth of the drilling hole, the resistance of flushing fluid (drilling fluid) through the channel, as well as the nature of the conveying drilling fluid. The deeper the drilling hole and the greater the pipeline resistance, the higher the pressure needed.
With the changes of drilling hole diameter and depth, the displacement of the pump can be adjusted accordingly. In the mud pump mechanism, the gearbox or hydraulic motor is equipped to adjust its speed and displacement. In order to accurately measure the changes in pressure and displacement, a flow meter and pressure gauge are installed in the mud pump.
The construction department should have a special maintenance worker that is responsible for the maintenance and repair of the machine. Mud pumps and other mechanical equipment should be inspected and maintained on a scheduled and timely basis to find and address problems ahead of time, in order to avoid unscheduled shutdown. The worker should attend to the size of the sediment particles; if large particles are found, the mud pump parts should be checked frequently for wear, to see if they need to be repaired or replaced. The wearing parts for mud pumps include pump casing, bearings, impeller, piston, liner, etc. Advanced anti-wear measures should be adopted to increase the service life of the wearing parts, which can reduce the investment cost of the project, and improve production efficiency. At the same time, wearing parts and other mud pump parts should be repaired rather than replaced when possible.
Summary :To become a Drilling Supervisor for a leading oil company and service the company to the best of my ability by applying knowledge and experience along with working safely and efficiently.
Description :Hoisting machinery including equipment such as pumps for air, water, mud, and tools used to correct problems in drilled holes caused by mechanical breakdowns.
Headline :Assist with good development and pumping tests along with maintaining records of drilling and servicing operations Obtain drilling samples Operate controls of drill rig or service rig.
Involve in SLIP and CUT operations Assist the driller in all rig floor activities during drilling, casing, cementing, making of BHA, installation of BOP, etc.
Ensure proper line up of the choke manifold and prepare trip sheet and kill street Take measurement of tools and pipes and prepare pipe tally Carry out a routine inspection of TDS, Blocks, Derrick and Crown wheel.
Headline :To further advance in the petroleum industry & utilize knowledge and experience in a leadership role as a petroleum Engineer, Asst. Driller, Driller or Directional Driller to effectively contribute to achieving the Organizational cause and overall development with excellence.
Trains drilling crew in the safe performance of their duties and the proper care and maintenance of the rig and drill string, including lubrication of equipment and housekeeping.
Objective :Dynamic leader with experience supervising all production lines, overseeing safety inspections, scheduling production and conducting weekly physical inventories. Focused decision maker with demonstrated ability to lead cross-functional teams in the design, development and launch of leading-edge solutions and processes.
Description :Prepared technical scopes of work, correspondence, and documentation that supported effective design, development, and implementation of a safe rig floor operation.
Inspected and monitored all rig floor and mud pump room systems including heating, ventilation and air conditioning (HVAC) and daylighting systems to determine energy use or potential energy savings.
Summary :Over 5 years experience in incident investigation, safety auditing, training evaluation/planning, and regulatory compliance evaluations. Backed up by 14 years of working for drilling contractors and specialty service providers.
Objective :Highly regarded in this field and demonstrates its commitment to loyalty and ability to recognize individuals whose integrity is evident through teamwork, dedication, problem-solving, and accountability. Interested in supervisory positions where leadership qualities and hands-on experience will be used in the advantage for safety and maximum production.
Headline :To join a well-established and professional organization that will add to my career and that would provide me with experience in my field. Where can apply technical skills to allow improves, grow, gain experience and apply it in the best way to serve career.
Summary :Extremely reliable & respectful enough to work in different cultures in a multi-national environment, commitment to work and employer, willingness to take new challenges and responsibilities, acquire a safety working environment for fellow employees.
Objective :Seeking a permanent position with a well-established company with room for advancement. Willing to take on any task given to with the mindset of finishing the job until it"s complete.
Description :Assist with good development and pumping tests along with maintaining records of drilling and servicing operations Obtain drilling samples Operate controls of drill rig or service rig
Headline :Seeking employment in the oil field as a driller, derrick men oil and gas, motor man or floor hand. Interested in heavy equipment operator or crane rigger.
Headline :Assistant Driller will be responsible for all aspects of drilling, including but not limited to: working with the driller and rig crew to ensure safe operations, logging and maintaining safety records, performing cementing procedures, taking a lead role in planning and executing well maintenance, operations, and well site activities.