discharge of mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> quotation

A wide variety of discharge manifold of mud pump options are available to you, such as 1 year, not available.You can also choose from new, discharge manifold of mud pump,as well as from energy & mining, machinery repair shops, and manufacturing plant discharge manifold of mud pump,and whether discharge manifold of mud pump is 1.5 years, or unavailable.

discharge of mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> quotation

Mud Pumps come in both electric and gas / diesel engine drive along with air motors. Most of these pumps for mud, trash and sludge or other high solids content liquid dewatering, honey wagon and pumper trucks. Slurry and mud pumps are often diaphragm type pumps but also include centrifugal trash and submersible non-clog styles.

WARNING: Do not use in explosive atmosphere or for pumping volatile flammable liquids. Do not throttle or restrict the discharge. Recommend short lengths of discharge hose since a diaphragm mud pump is a positive displacement type and they are not built with relief valves.

discharge of mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> quotation

Since the NOV A1700-PT Triplex Mud Pump was built approximately 60 years ago, the industry has widely accepted the three cylinder or triplex style pump. Triplex mud pumps are manufactured worldwide, and many companies have emulated the original design and developed an improved form of the triplex pump in the past decade.

NOV A1700-PT Triplex Mud Pumps have many advantages they weight 30% less than a duplex of equal horsepower or kilowatts. The lighter weight parts are easier to handle and therefore easier to maintain. The other advantages include;They cost less to operate

One of the more important advantages of triplex over duplex pumps, is that they can move large volumes of mud at the higher pressure is required for modern deep hole drilling.

NOV A1700-PT Triplex Mud Pump is gradually phasing out duplex units. In a triplex pump, the pistons discharge mud only when they move forward in the liner. Then, when they moved back they draw in mud on the same side of the piston. Because of this, they are also called “single acting.” Single acting triplex pumps, pump mud at a relatively high speeds. NOV A1700-PT Triplex Mud Pump has three pistons each moving in its own liner. It also has three intake valves and three discharge valves. It also has a pulsation dampener in the discharge line.

discharge of mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> quotation

Choose a used Emsco FB-1600 Triplex Mud Pump from our inventory selection and save yourself some money on your next shallow drilling oilfield project. This Emsco FB-1600 Triplex Mud Pump is used and may show some minor wear.

We offer wholesale pricing on new Emsco FB-1600 Triplex Mud Pump and pass the savings on to you. Contact us to compare prices of different brands of Mud Pump. This equipment is brand new and has never been used.

Our large network often has surplus Emsco FB-1600 Triplex Mud Pump that go unused from a surplus purchase or a project that was not completed. Contact us to see what Emsco FB-1600 Triplex Mud Pump we have in inventory. The surplus Emsco FB-1600 Triplex Mud Pump are considered new but may have some weathering depending on where it was stored. Surplus oilfield equipment is usually stored at a yard or warehouse.

We have refurbished Mud Pumpthat have been used and brought up to functional standards. It is considered a ready to use, working Mud Pump. Please contact us for more information about our refurbished Emsco FB-1600 Triplex Mud Pump. These Mud Pump have been used and brought up to functional standards. It is considered a working Mud Pump. Please contact us for more information about the product.

discharge of mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> quotation

Hydraulic cylinder is also called the valve box, it is a major part to the fluid end parts. Blank forged by highstrength alloy steel. After heat treated, with multi-channel processes. The three cylinders of each pump is interchangeable. The following key parts: cone sawtooth thread of cylinder head, connect of the curve of all the screw hole and inner cavity.

We can also supply modules forged by alloy 35CrMo or 40CrMoMn. It is of high quality with secondary smelting, and with deoxygenates treatment. It is manufactured according to JB/TQ252-81 Specification and with high mechanical performance. Topland suppliesa complete line of interchangeable fluid end modules and accessories for triplex mud pumps. Fluid ends and components are interchangeable to OEM’s such as National, Emsco, Gardner Denver, Bomco, Ideco,Weatherford, Drillmec, Texma, Mud King, Honghua, RG, RS, GPM, LS-NOW, Wirth and Oilwell.

discharge of mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> quotation

We have attained huge reputation as prominent manufacturer and supplier of Portable Dewatering Submersible Pumps. These pumps are well accepted in the market for their light weight, robust construction and excellent functional accuracy. We design these pumps by utilizing latest tools and techniques as per latest industrial norms with quality tested raw materials. We supply these machines in wide specifications at affordable price range to our customers.

• Portable submersible pumps are one of its kinds. We have a wide range of selection within the same Horse Power rating for these pumps. Our construction is robust compared to other make pumps and has proved its self in the market with its trouble free Operation

• Impeller - We give non-clog impeller which will help Dewatering polluted liquid easily. Different MOC"s are provided to fight abrasive nature of the polluted liquid

• Motor – submersible pumps are available in Single phase and three-phase squirrel cage induction dry motor with ‘F" class insulation and IP 68 protection

• We provide pumps with Aluminum MOC, which will make the pump very light and will be extremely handy for the operator. Trolley mounted construction is also an available option

discharge of mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> quotation

A Mud Pump may have many changeable parts, such as liner, piston, extension rod, pulsation dampener, valve, clamp, etc. Lake Petro could provide 100% interchangeable parts of many common brands of pump. We offer Liners with Ceramic (Zirconia and Aluminium oxide) and Steel (Metal and Bi-metal) materials. Piston assembly is the important spare parts and expendable parts of oil drilling mud pumps. Mud pump valve assy include valve body, valve seat, valve insert (valve rubber ). Pulsation Dampener is usually installed on the discharge line to reduce the fluctuation of pressure and displacement of the drilling mud pump. Fluid End Module is an important component of the hydraulic pump end of the mud pump.

discharge of mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> quotation

Parker"s HGP Profile delivers over three times the life for suction and discharge seals in multi-plex frac pump applications over traditional HNBR D-rings. Owing to its patent pending geometry and proprietary materials of construction, the HGP Profile can withstand pressure up to 10,000 psi at 3 hertz in abrasive, acidic fracturing fluid.

The validated design was tested against traditional D-rings under real world conditions where the elastomer D-rings failed after short service hours. In striking contrast, Parker’s HG Profile provided 4 times the life of the benchmarked D-rings.

• Stabilizing lip is located just above the base of the seal to provide enhanced sealing performance and ensure a tight, stable fit in the gland and provide consistent seal performance from extreme pressure cycles

discharge of mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> quotation

Heat-treated and internally hardened for high durability; available in various materials to meet a wide range of applications; standard one-and/or-two-piece configuration, with designs available for pressure of 5000psi(35.1Mpa), 7500psi(52.7Mpa), and 10000psi(70.3Mpa); discharge connections available on each side; suction connections on each side or front center.

For maximum performance and durability, our modules are made from individually forged, heat-treated alloy steel and feature an API 7 valve assembly for improved flow. Our L-shaped design features bore-seal technology for improved seal performance in higher pressures and is compatible with numerous “F-Series” drilling pumps including Honghua®, Bomco® Rongsheng®, Workforce® and other similar designs.

YINDA offers a complete line of accessories for OEM fluid end modules, CNC machining makes these accessories uniformly dimensional and interchangeable with OEM.

YINDA offers a complete line of accessories for OEM fluid end modules, CNC machining makes these accessories uniformly dimensional and interchangeable with OEM.

discharge of mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> quotation

We are an ISO 9001:2008 & ISO 14000 certified Mud Pumps manufacturer, exporter and supplier based in Karnal, Haryana, India. OSWAL Mud Pumps are widely appreciated for its smooth finish, high tensile strength, corrosion resistant and high performance. These are precisely fabricated in compliance with world quality standard which comes with anti-frictional ball bearing, shaft EN-8 and mechanical seal. In order to achieve the minimum load on the impeller with increase in discharge, we have transformed the inner curvatures of OSWAL pump casting. OSWAL mud pumps are widely used in oil fields and cement slurry water for crude oil and mud slurry handling. Due to its high quality features, we have been able to meet highest clients satisfaction worldwide and received 5 star from BEE (Bureau of Energy Efficiency).

discharge of mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> quotation

The Hyundai submersible mud pumps are used for handling sewage, wastewater, and sludge of different types, flood or rainwater, mud, and water containing solid particles. These submersible mud pumps are efficient, durable, and completely waterproof. At Hyundai, our main goal is to provide high quality products that have a long life and do not incur extra maintenance costs. Our submersible mud pump is one such product and we are proud to have designed it.

A mud pump is a piston driven pump that can produce high-pressure operations to safely transfer high viscosity fluids over an extended depth. Submersible mud pumps are vital in construction, mining and quarrying applications as they allow users to remove water, slurry and sludge. The submersible mud pump has many applications in industrial service, but it has proven to be invaluable in many drilling operations.

The duplex mud pump features two pistons in constant action to move the fluid. The triplex mud pump has all but replaced the duplex version in most applications, although you will still find the latter in use in some smaller countries. The triplex mud pump features a triple piston design that is more efficient than the duplex design.

The latest designs of the mud pump are the quintuplex. As the name suggests, these designs feature five or six pistons in a reciprocating design. Although not in widespread use as compared to the triplex design, these mud pumps spread the pumping action across the rotational cycle, creating less mud noise. This allows for better measurements and logging to take place while in operation.

Rotational power is supplied to the mud pump through an external power source. The power end of the pump converts this rotational energy through a crankshaft to a reciprocating motion that moves the pistons. The pistons move back and forth in their liners, exerting a force on the cylinder chamber. During the retraction of the piston, valves open to allow the fluid to be drawn into the cylinder. Once the piston has fully retracted, it is pushed back into the cylinder.

At this time the intake valves are closed and the exhaust valves open, allowing the piston to force the fluid out of the cylinder under pressure. Once the piston reaches its maximum depth into the cylinder, the exhaust valves close and the process repeats.

Due to the pressure and material being pumped, most mud pump applications can create a lot of vibration. To combat this, many mud pump applications incorporate pulsation dampeners. These are typically used on both suction and discharge sides of the pump.

In some cases, a positive displacement pump may pull the fluids at a pressure lower than its vapor pressure. When this happens, damaging cavitations can take place. In these cases, a charge pump might be required at the inlet side to maintain a positive pressure on the suction stream.

When selecting a mud pump, there are two main parameters to be used, pressure and displacement. Pressure is the net pumping pressure that the pump can safely provide. The requirement for pressure increases as the drilling depth and fluid (or slurry) viscosity increases.

Displacement is the volume of fluid that the pump can transfer within a given time period. In most applications, this is rated as discharged liters per minute.

Mud pumps are ideal wherever a lot of fluid needs to be pumped under high pressure. They are considered an essential part of mostoil well drilling rigs. Mud pumps can deliver high concentration and high viscosity slurry in a stable flow, making them adaptable to many uses.

The price for Hyundai submersible mud pumps is reasonable and allows you to make a purchase without having to put a strain on your pocket. The price ranges between Rs. 35,000- Rs. 45,000, depending on what model you prefer.

discharge of mud <a href='https://www.ruidapetroleum.com/product/49'>pump</a> quotation

The “pond” is actually a man made dam which covers an area of about 40ha and has rockfill embankments of up to 53m high along the southern side that forms the impoundment.  It initially constructed in 1959 to act as a tailings pond to take the bauxite residue (red mud) from the Ewarton Plant situated about 5km away and 300m lower.  The red mud was pumped as a slurry comprising about 20% solids to the pond over a period of about 32 years up to 1991 when the pond was replaced by the Charlemount Mud Stacking and Drying Facility.  During this period the pond embankments (referred to as dams), were raised up to 7 times providing a final crest elevation of 472m.  The pond was however never filled to its final design capacity and the mud beach level remained at about 469m and the central area about 458m leaving a concave depression which held about 1.4mil m3 of water with elevated pH and some caustic content.

The remediation plan for the pond includes the removal of the ponded water and then the regrading of the mud surface to be free draining so that it can be stabilised and vegetated.  About 500,000 m3 of mud will need to be moved over a distance of up to 1km in order to create the required profile.  Due to the very soft nature of the surface muds (shear strength of less than 3kPa) its bearing capacity is less than 20kPa hence it is not accessible using even modified earthworks equipment.  In addition, the muds are thyrotrophic and under any vibration or shear loading, rapidly liquefy resulting in significant reduction in shear strength and loss of bearing capacity.  Using conventional earthmoving equipment would therefore require extensive “floating” haul roads with a high risk of machinery getting stuck or entire plant loss and risk to personnel.  It was therefore decided to investigate the possibility of pumping the in-situ red mud.

A mud pumping trial was undertaken to assess the feasibility of using this technique to do the bulk mud moving.  Pumping red mud is not unusual and the muds were initially pumped up to Mt Rosser Pond.  However, the muds are usually pumped at a solids content of 30% or less.  Once deposited, they can take years to reconsolidate and firm up sufficiently to allow access for light earthworks and agricultural plant.

In addition to the mud pumping, the trial included infilling three small scale geotubes to assess their performance as these may be needed as part of the regrading works.

The main aim of the pump trial was to determine if the muds could be pumped in their insitu state, and if not, what amount of water is required and how the variations in water content affect pump rates.

The mud pumping trial was undertaken using a 4” EDDY Pump.  This pump was recommended due to its ability to handle variable solids and robust operating mechanism.  The pump unit incorporated a hydraulic drive and cutter head.  The unit was mounted onto the boom of a JCB 220 excavator which also supplied the hydraulic feed to power the pump for the required range of 30-40 GPM at 3,500 to 4,000 psi (2428MPa).  The cutter head was powered by a standalone hydraulic power unit capable of providing the required 30gpm at 200psi (1.9 l/s at 13.8MPa).  If mounted on a 30-ton excavator with a System 14 hydraulic system and dual auxiliary feeds to the boom, all necessary hydraulic power for the pump and cutter head can be supplied by the excavator.  This equipment was however not available at the time in Jamaica.

In addition to the pump mounted on the excavator a Long Reach excavator (CAT 325) was used to move muds towards the cutter head but also to loosen up the muds and mix in additional water to facilitate pumping.  Water was added by pumping it directly from the pond using a 3” diesel water pump.

Prior to pumping the muds, the mud pump would operate in recirculation mode in order to prime the pump.  When in recirculation (re-circ) mode, the material pumped would be diverted to a short discharge pipe mounted on the pump directed back parallel to the cutter head. This action would help agitate and stir the muds.

The geotubes for the trials were 6m long and 1m high (filled) and were supplied by Tencate.  The tubes were made from a woven polyester – GT1000M and had a central top filling point.  A set of small bags with a polymer test set was also provided but this was not tried during this occasion.

A geotechnical soils investigation was undertaken on the muds within Mt Rosser pond in 2004.  It showed the material to be predominantly clayey silt with approximately 13% sand, 29% clay and 58% silt using conventional sieve analysis and hydrometer.  Atterberg limits indicate that the material is an intermediate to high plasticity clay.  The muds do however vary across the lake and also vertically. This is mainly as a consequence of the deposition process and discharge location.  Close to the discharge location the courser materials would settle out first and the finer materials would disperse furthest and to the opposite end of the pond.  The results are presented in figure 4.1.

Earlier this year, additional mud samples were tested as it was evident that standard soil mechanics tests did not provide an accurate assessment of this fine material.  This was particularly evident in tests done with dry sieving which shows the material as well-graded sand (see results for samples 5300, 5301, 5302 on figure 4.2).  When dispersed in water, even with an agent, the ‘yield-pseudo-plastic’ rheology of the muds appeared to affect the hydrometer results with large variations between tests (see results of samples PFT4&5 taken during mud pumping trials on figure 4.2).

The additional testing comprised of undertaking gradings using a Laser Particle Analyzer. The results indicated that the muds are predominantly Silt although the silt % varied from 30% to 80% with the material being either more sandy or more clayey (up to 15% clay). See results of samples ending in “L” on figure 4.2 below.

Moisture content tests on the muds taken from within the mud pond but below the ponded water ranged from 100% to 150% (50% to 40% solids).  The muds at the pump test location were 137% (42% solids).

Shear strength was generally very low ranging from 1kPa to 6kPa increasing with depth.  Dynamic probes previously undertaken indicated that the muds are “very soft” to 5m increasing in strength slightly to “soft” at a depth of 9m after which they increase to firm becoming stiff.

The pH of the muds ranged from 10.3 to 11.7, (ave 11.2).  Previous testing indicated that the surface muds have the lower pH although once through the crust, the pH tends to be higher. When doing the trials, the muds up to a depth of about 2.5m was intermixed, hence any stratification in pH could not be determined.

Initially, pumping was problematic mainly due to the excavator being underpowered. This was diagnosed as a hydraulic pump problem and the excavator was replaced.  The cutter head (which also acts to protect the intake) tended to blind with mud (Photo 5.1) and was also not providing enough agitation to liquefy the muds.  This was partly resolved by adding “stirrers” (2 steel loops welded either side) to the rotating cutter head and also a “comb” (Photo 5.2) to keep the gaps within the cutter head open.

Mud pumping rates varied from 21 l/s to 52 l/s (332 – 824gpm) and it was clearly visible that the more liquid the muds were the higher the pump rate was.  Samples were taken at different discharge rates and moisture content and percent solids determined by laboratory testing.  The results are plotted in Figure 5.1 and although scattered, do give an indication of the effects of solids content on flow rates.  The natural moisture content of the muds (insitu) at the test location was 137%, or 42% solids.  This is shown in Figure 5.1 as a vertical line.  Pumping muds close to the percent solids was achieved although flow rates were low.

As mentioned previously, the long reach excavator was used to loosen up the muds.  Water was pumped from the pond using a 3” pump into the excavation and the long reach would then work the muds to mix the water in.  The mud pump would then be used in recirculation mode to further mix the muds into a more consistent state.  Even with this mixing and agitation, the water tended to concentrate on the surface. This aided the initial process of priming the pump and once primed thicker muds at 1m to 2m below the surface could be pumped.  However, it was found that the deeper muds tended to be lumpy and this would significantly reduce or stop the flow requiring the pump to be lifted into thinner muds or having to go back into re-circ mode or having to fully re-prime.  The pump discharge was therefore very inconsistent as the suction intake position constantly needed adjustment in an attempt to get adequate discharge but also pump the thickest muds possible.

Discharge of the pumped muds was through 30m of flexible hose then 60m of 4” HDPE pipe which had an internal diameter of about 87mm (3.5”).    The muds were discharged onto the original mud beach which lies at a gradient of about 9%. On deposition the muds slowly flowed down gradient.  At times the flow would stop and the muds would build up then flow again in a wave motion.  The natural angle of repose would therefore be a few degrees less than this – probably 5% to 6%.

Although the muds have very low shear strength, and on agitation liquefy, the sides of the excavation had sufficient strength to stand about 2m near vertical.  Even overnight, there was limited slumping and the bank could be undermined by about 0.5m with the cutter head/agitator before collapsing.

On termination of pumping, in order to flush the pipeline, thin watery muds were pumped until the line was clear. A “T” valve system was then used to connect the 3” water pump line and this was then used to flush the pipe with water.

Three geotubes (1m x 6m) were filled with red muds pumped using the 4” Eddy pump. Fill rates were about 30 to 40l/s although it was difficult to assess as the flow and mud consistence was not visible.

Tube 1 was filled initially with more runny mud and then thicker muds as the pump operator got a better feel for conditions.  The tube was filled until firm.  The second tube was filled with thicker muds and filling continued until the tube was taut.  These two tubes were positioned on the sloping beach in order to form a small “U” impoundment area that would later be filled with pumped muds.  Although the area was prepared, the sloping ground caused the first tube to rotate through about 20 degrees. The tube was staked and the downslope side backfilled.  A more defined bed was created for the second tube and the same rotational issue was limited.  The two filled tubes with the ponded mud are shown in Photos 5.7 and 5.8.  Other than a small leak at the contact between the two geotubes, the ponding of the muds was successful.

The third tube was positioned on level ground. It was filled with medium runny (but consistent thickness) muds and was filled until the tube was taut.

In all three cases, there was very little mud loss or seepage from the tubes.  When stood on, some red water would squeeze out around the pressure area.  Once filled taut, the entire bag would have small red water droplets form on the outside (visible in Photo 5.11) , but the seepage was in general nominal.

The tubes have been monitored and the most recent photo’s taken on 10 October 2011 (6 weeks after filling) show how the tubes have reduced in volume due to the dewatering of the contained muds.  Volume loss is estimated to be around 30%.  The anticipated moisture content would therefore be about 90% and the solids around 53%.

The muds pumped into the trial pond behind the geotubes were medium thick to thick, probably in the order of 37 – 40% solids.  After 6 weeks the mud has not only firmed-up but had dried out significantly with wide and deep surface cracks as are evident in Photo 5.14 and 5.15.

The muds can be pumped at close to their insitu moisture content and most likely at their in-situ moisture content if they were agitated more and the pipeline system was designed to reduce friction losses.

Be able to access the mud surface and move around efficiently and safely. The suggestion is to have the pump mounted on a pontoon that is positioned using high strength rope (dynema) or steel cable.  The pump system should be remotely controlled as this would limit regular movement of personnel on the muds.

Have sufficient power and volume capacity to pump the muds at close to or at in-situ moisture content and discharge them about 1000m through a flexible pipeline.

It was also evident from the trials that the muds do not slump and flow readily.  It will therefore be necessary to have an amphibious excavator to loosen up the muds in the area around the pump head.  This weakened and more liquid mud would also aid the movement of the pump pontoon.  To also limit the amount of movement the pontoon will need to do, the amphibious excavator could also move muds towards the pump location.

Using the capacity of the 4” mud pump, mud moving would take about 1.5 to 2 years, the pump will however need to be more suited to the task.  A target period of 1 year however seems reasonable.  However, prior to this, equipment will need to be procured and imported into Jamaica. The 6 and 10 inch Excavator Dredge Pump Attachments are also being considered as an option for higher GMP and a more aggressive completion timeline.  A preliminary programme is as follows: