universal power tong factory

The global hydraulics market keeps growing, and more suppliers are getting into the business. When shopping, you will want to compare prices, specifications, and other factors on your power tong hydraulic, and that’s where Alibaba.com comes in. You can compare the prices of different versions of the same part from different manufacturers, giving you value for your money. And to cater to the increased demand, Alibaba.com partners with many manufacturers and suppliers to bring you a wide variety of wholesale power tong hydraulic from the comfort of your home.

Whether you’re looking for hydraulics to upgrade your machinery, service, or repair them, from the tiniest robots to monster machines like presses in the factory, you can find everything you need from Alibaba.com. If you’re planning to run material handling equipment, say a metal baler, then you will need power tong hydraulic, and the collection at Alibaba.com is unbeatable. Increased automation in agricultural equipment and a rise in the advancement of industrial practices call for a vast supply of hydraulics, all of which you can shop from Alibaba.com at affordable wholesale prices.

Wholesale power tong hydraulic at Alibaba.com takes care of your whole hydraulic system. From the valves to pressurized components, anything you need to transmit large forces using smaller forces. The size of your system does not matter. Provided you have a part number; you can reach out to the supplier and place an order. Choose from the different castings, gearing systems, and build of the part. You can find any power tong hydraulic you need to use on your lightweight machine or even heavy equipment like excavators and rock breakers. And if your budget does not accommodate a new component, the range of second-hand parts will complement your machine just fine.

universal power tong factory

(From left) Ron Feigel, business development, and Fred Aleksic, product development manager, show off the company’s flagship power tong equipment. Images: Universe Machine

General manufacturing was the shop’s strength. However, in the late 1980s Universe machine found itself focused on product development. The shop designed and engineered a high-quality line of power tongs—a machine used on drilling rigs to screw and unscrew tubing or casing to a specific torque. It was this development that really pushed the shop to branch out into this new area of opportunity. Today Universe Machine’s power tongs and other related products are sold globally.

“Investing and incorporating new technology and focusing on research and development during the pandemic has led to extensive testing and improvements of our existing products,” said Feigel. “We’ve engineered a new line of compact, high-torque power tong equipment, which is currently being introduced to market. We also added a Toshiba TUE-200(S) vertical lathe with live tooling. All of this investment, including retaining skilled, long-term employees, signals to our employees and customers that we can be trusted to continue moving forward, even during difficult times.”

universal power tong factory

A two-speed Hydra-Shift® motor coupled with a two-speed gear train provides (4) torque levels and (4) RPM speeds. Easily shift the hydraulic motor in low speed to high speed without stopping the tong or tublar rotation, saving rig time.

A patented door locking system (US Patent 6,279,426) for Eckel tongs that allows for latchless locking of the tong door. The tong door swings easily open and closed and locks when torque

is applied to the tong. When safety is important this locking mechanism combined with our safety door interlock provides unparalleled safety while speeding up the turn around time between connections. The Radial Door Lock is patented protected in the following countries: Canada, Germany, Norway, United Kingdom, and the United States.

The field proven Tri-Grip® Backup features a three head design that encompasses the tubular that applies an evenly distributed gripping force. The Tri-Grip®Backup provides exceptional gripping capabilities with either Eckel True Grit® dies or Pyramid Fine Tooth dies. The hydraulic backup is suspended at an adjustable level below the power tong by means of three hanger legs and allowing the backup to remain stationary while the power tong moves vertically to compensate for thread travel of the connection.

universal power tong factory

Afghanistan - AFGAlbania - ALBAlgeria - DZAAmerican Samoa - ASMAndorra - ANDAngola - AGOAnguilla - AIAAntigua and Barbuda - ATGArgentina - ARGArmenia - ARMAruba - ABWAustralia - AUSAustria - AUTAzerbaijan Republic - AZEBahamas - BHSBahrain - BHRBangladesh - BGDBarbados - BRBBelarus - BLRBelgium - BELBelize - BLZBenin - BENBermuda - BMUBhutan - BTNBolivia - BOLBosnia and Herzegovina - BIHBotswana - BWABrazil - BRABritish Virgin Islands - VGBBrunei Darussalam - BRNBulgaria - BGRBurkina Faso - BFABurma - MMRBurundi - BDICambodia - KHMCameroon - CMRCanada - CANCape Verde Islands - CPVCayman Islands - CYMCentral African Republic - CAFChad - TCDChile - CHLChina - CHNColombia - COLComoros - COMCongo, Democratic Republic of the - CODCongo, Republic of the - COGCook Islands - COKCosta Rica - CRICote d Ivoire (Ivory Coast) - CIVCroatia, Republic of - HRVCyprus - CYPCzech Republic - CZEDenmark - DNKDjibouti - DJIDominica - DMADominican Republic - DOMEcuador - ECUEgypt - EGYEl Salvador - SLVEquatorial Guinea - GNQEritrea - ERIEstonia - ESTEthiopia - ETHFalkland Islands (Islas Malvinas) - FLKFiji - FJIFinland - FINFrance - FRAFrench Guiana - GUFFrench Polynesia - PYFGabon Republic - GABGambia - GMBGeorgia - GEOGermany - DEUGhana - GHAGibraltar - GIBGreece - GRCGreenland - GRLGrenada - GRDGuadeloupe - GLPGuam - GUMGuatemala - GTMGuernsey - GGGuinea - GINGuinea-Bissau - GNBGuyana - GUYHaiti - HTIHonduras - HNDHong Kong - HKGHungary - HUNIceland - ISLIndia - INDIndonesia - IDNIreland - IRLIsrael - ISRItaly - ITAJamaica - JAMJapan - JPNJersey - JEJordan - JORKazakhstan - KAZKenya - KENKiribati - KIRKorea, South - KORKuwait - KWTKyrgyzstan - KGZLaos - LAOLatvia - LVALebanon - LBNLiechtenstein - LIELithuania - LTULuxembourg - LUXMacau - MACMacedonia - MKDMadagascar - MDGMalawi - MWIMalaysia - MYSMaldives - MDVMali - MLIMalta - MLTMarshall Islands - MHLMartinique - MTQMauritania - MRTMauritius - MUSMayotte - MYTMexico - MEXMicronesia - FSMMoldova - MDAMonaco - MCOMongolia - MNGMontenegro - MNEMontserrat - MSRMorocco - MARMozambique - MOZNamibia - NAMNauru - NRUNepal - NPLNetherlands - NLDNetherlands Antilles - ANTNew Caledonia - NCLNew Zealand - NZLNicaragua - NICNiger - NERNigeria - NGANiue - NIUNorway - NOROman - OMNPakistan - PAKPalau - PLWPanama - PANPapua New Guinea - PNGParaguay - PRYPeru - PERPhilippines - PHLPoland - POLPortugal - PRTPuerto Rico - PRIQatar - QATReunion - REURomania - ROURussian Federation - RUSRwanda - RWASaint Helena - SHNSaint Kitts-Nevis - KNASaint Lucia - LCASaint Pierre and Miquelon - SPMSaint Vincent and the Grenadines - VCTSan Marino - SMRSaudi Arabia - SAUSenegal - SENSerbia - SRBSeychelles - SYCSierra Leone - SLESingapore - SGPSlovakia - SVKSlovenia - SVNSolomon Islands - SLBSomalia - SOMSouth Africa - ZAFSpain - ESPSri Lanka - LKASuriname - SURSwaziland - SWZSweden - SWESwitzerland - CHETaiwan - TWNTajikistan - TJKTanzania - TZAThailand - THATogo - TGOTonga - TONTrinidad and Tobago - TTOTunisia - TUNTurkey - TURTurkmenistan - TKMTurks and Caicos Islands - TCATuvalu - TUVUganda - UGAUkraine - UKRUnited Arab Emirates - AREUnited Kingdom - GBRUnited States - USAUruguay - URUUzbekistan - UZBVanuatu - VUTVatican City State - VATVenezuela - VENVietnam - VNMVirgin Islands (U.S) - VIRWallis and Futuna - WLFWestern Sahara - ESHWestern Samoa - WSMYemen - YEMZambia - ZMBZimbabwe - ZWE

universal power tong factory

As shown in Figure 1, power tong head torque check system of the present invention comprises detection module 11, Data Enter module 12, data receiver display module 13, data processing chart display module 14 and calibration certificate generation module 15.

Data processing chart display module 14 is for comparing process to the actual torque value of the binding clip of power tong detected by detection module 11 and the standard torque value of this binding clip of power tong, calculate the error of actual torque value and standard torque value, by the standard torque value of this binding clip of power tong, the actual torque value of the binding clip of power tong that detection module 11 detects, error between actual torque value and standard torque value, matching relationship between the standard torque value of this binding clip of power tong and its hydraulic system pressure and the matching relationship between the actual torque value of this binding clip of power tong and its hydraulic system pressure are reflected in calibration chart, and by these calibration result information displaying in software display interface.

Preferably, for the Power Tong installing different tubing, the detection module in power tong head torque check system of the present invention has following three kinds of embodiments.

As shown in Figure 2, the detection module in this embodiment is applicable to carry out verification to the power tong head torque of installing drilling tool and detects.This detection module comprises simulation tubing and torque sensor, and wherein, simulation tubing comprises simulation tubing top connection 21 and simulation tubing lower sub 22; Torque sensor comprises sensor body 23 and torque gauge 24, torque gauge is set in the middle part of sensor body 23, and sensor body 23 being arranged in a part of two parts of torque gauge 24 both sides for detection link 231, another part is coupling shaft 232.Simulation tubing top connection 21 is the top connection of simulation drilling tool, and simulation tubing lower sub 22 is the lower sub of simulation drilling tool, and simulation drilling tool top connection and the lower sub of simulation drilling tool are tubular structure.Simulation drilling tool top connection to be set in sensor body on the detection link 231 on 23, and the internal diameter of this simulation drilling tool top connection equals the diameter detecting link 231; The lower sub of simulation drilling tool is set on the coupling shaft 232 in sensor body 23, and the internal diameter of this simulation drilling tool lower sub equals the diameter of coupling shaft 332.The external diameter of torque gauge 24 equals to simulate the external diameter of drilling tool top connection and the external diameter of simulation drilling tool lower sub.Certainly, this power tong head torque calibration equipment also can verify the power tong head torque of installation two sections of unequal drilling tools of external diameter.Preferably, non-contact torque sensor selected by torque sensor, and the sidewall of detection link 231 in its sensor body 23 is provided with keyway or key (not shown), like this, when using this detection module to verify power tong head torque, the moment of torsion that binding clip of power tong is applied in the top connection of simulation drilling tool is delivered on torque gauge 24 by keyway or key, binding clip of power tong can be measured by torque gauge 24 and be applied to the actual torque of simulating in drilling tool top connection, and then draw the matching relationship of the reality between the hydraulic pressure of this power tong head torque and Power Tong and binding clip moment of torsion.Preferably, detecting key on link 231 sidewall can one optionally in flat key, screw key, spline or square key.Certainly, torque sensor also can select foil gauge torque sensor, utilizes foil gauge on being positioned in its sensor body 23 detection link 231 sidewall to realize the transmission of moment of torsion.

As shown in Figure 3, the power tong head torque that the detection module in this embodiment is applicable to installing oil pipe or sleeve pipe verifies.The difference of this embodiment and the first embodiment is, simulation tubing is simulation oil pipe or analog casing, wherein, simulation tubing top connection 21 is simulation oil pipe (sleeve pipe) top connection, simulation tubing lower sub 22 is simulation oil pipe (sleeve pipe) lower sub, and the external diameter of simulation oil pipe (sleeve pipe) top connection equals the external diameter of simulating oil pipe (sleeve pipe) lower sub, the internal diameter of simulation oil pipe (sleeve pipe) top connection equals the internal diameter of simulating oil pipe (sleeve pipe) lower sub.The end of one end that simulation oil pipe (sleeve pipe) top connection is connected with the detection link 231 in sensor body 23 is provided with circular inner edge boss 211, and the internal diameter of this inner edge boss 211 equals the diameter detecting link 231; The end of one end that simulation oil pipe (sleeve pipe) lower sub is connected with the coupling shaft 232 in sensor body on 23 is provided with circular inner edge boss 221, and the internal diameter of this inner edge boss 221 equals the diameter of coupling shaft 232.Linked together by inner edge boss 211 and detection link 231 in simulation oil pipe (sleeve pipe) top connection, after simulation oil pipe (sleeve pipe) lower sub is linked together by inner edge boss 221 and coupling shaft 232, the external diameter being set in the torque gauge 232 in sensor body 231 is less than the external diameter of simulation oil pipe (sleeve pipe) top connection, and have spacing between the inwall of the sidewall of detection link 231 and simulation oil pipe (sleeve pipe) top connection, there is spacing between the sidewall of coupling shaft 232 and the inwall of simulation oil pipe (sleeve pipe) lower sub.Preferably, the external diameter of torque gauge 232 equals to simulate the internal diameter of oil pipe (sleeve pipe) top connection and the internal diameter of simulation oil pipe (sleeve pipe) lower sub.Preferably, the sidewall detecting link 231 is provided with keyway or the key of transmitting torque and connecting analog oil pipe (sleeve pipe) top connection.

As shown in Figure 4, the power tong head torque that the detection module in this embodiment is also applicable to installing oil pipe or sleeve pipe verifies.The difference of this embodiment and the second embodiment is, the external diameter of the simulation tubing top connection 21 in this embodiment is less than the external diameter of simulation tubing lower sub 22.

Preferably, as shown in Figure 1, Data Enter module 12 comprises parameter input unit 121 and Detection Information input block 122; Wherein, parameter input unit 121 is for inputting the device name of Power Tong to be verified, specifications and models, factory number and manufacturing firm, and the range of Power Tong, accuracy class and indicating value permissible error scope; Detection Information input block 122 is for information, the certificate number of input power pincers affiliated unit, calibration date, calibration location, environment temperature, ambient humidity, identifier, check people, Approved by, and the device name of detection module, device numbering, verification certificate number and verification certificate the term of validity.Like this, the essential information of Data Enter module 12 typing Power Tong, to ensure the information match in verified Power Tong and calibration certificate, is convenient to the calibration certificate that relevant staff consults Power Tong.

Preferably, as shown in Figure 1, data receiver display module 13 comprises data receipt unit 131 and data display unit 132, and the data that data receipt unit 131 detects for receiving detection module 11, the data that data display unit 132 first receives data receipt unit 131 judge and error correction, then the authentic and valid data obtained are shown in the display interface of this power tong head torque check system.Like this, data receiver display module 13 can be avoided the data receiving transmission distortion or the partial data collected by detection module 11 that receives to be shown in the lower display interface of power tong head torque check system as authentic and valid data, and then avoid data processing chart display module 14 effective for non-genuine data to be processed as authentic and valid data.Preferably, carry out data transmission between detection module 11 and data receiver display module 13 by RS232 bus, the data detected to avoid detection module 11 are the distortion because being subject to outer signals interference when being transferred to data receiver display module 13.Preferably, adopt event-driven explanation to realize avoiding data to leak to the data collection that detection module 11 detects and adopt, and then make data receiver display module 13 can receive all data messages being transferred to data receiver display module 13 by detection module 11.Like this, data acquisition program response in time and reliability is high.

Preferably, as shown in Figure 1, data processing chart display module 14 comprises data processing unit 141 and chart display unit 142.Wherein, the actual torque value of binding clip of power tong that data processing unit 141 pairs of detection modules 11 detect and the standard torque value of this binding clip of power tong compare, and calculate the error between the actual torque value of this binding clip of power tong and standard torque value.Chart display unit 142 is by the standard torque value of binding clip of power tong, error between the actual torque value of this binding clip of power tong that the actual torque value of this binding clip of power tong that detection module 11 detects and data processing unit 141 calculate and standard torque value is reacted in calibration chart with data mode, matching relationship between the actual torque value of the matching relationship between the standard torque value of this binding clip of power tong and its hydraulic system pressure and this binding clip of power tong and its hydraulic system pressure is reacted in calibration chart with the form of calibration curve, and this calibration chart is presented in the display interface of this power tong head torque check system.This calibration chart can matching relationship between the standard torque value of matching relationship clearly between the reaction power pincers actual torque value of binding clip and its hydraulic system pressure and this binding clip of power tong and its hydraulic system pressure.Like this, the user that this calibration chart can be this Power Tong reaches expection torque value in the process using this Power Tong provides important reference frame.

Existing composition graphs 1 and Fig. 5 illustrate the process that this power tong head torque check system verifies power tong head torque, and concrete steps are as follows:

Step 502: to the device name of typing Power Tong in Data Enter module 12, specifications and models, factory number and manufacturing firm and range, accuracy class and indicating value permissible error scope on the display interface of this power tong head torque check system, this Power Tong affiliated unit information, certificate number, calibration date, calibration location, environment temperature, ambient humidity, identifier, check people, Approved by and the term of validity of the device name of detection module, device numbering, verification certificate number and verification certificate;

Step 503: start detection module 11 pairs of Power Tongs verify, receives by data receiver display module 13 data that detection module 11 detects, and tests the data detected;

Step 505: in the actual torque value of the binding clip of power tong detected in the 141 pairs of steps 503 of the data processing unit in data processing chart display module 14 and step 502, the standard torque value of the binding clip of power tong of typing compares, and calculates error therebetween;

Step 506: the matching relationship that the chart display unit 142 in data processing chart display module 14 gathers between the standard torque value of matching relationship between the actual torque value of binding clip of power tong and its hydraulic system pressure and this binding clip of power tong and its hydraulic system pressure forms calibration curve, by this calibration curve, the standard torque value of this Power Tong, the actual torque value of this Power Tong and the error between the actual torque value of this Power Tong and standard torque value are reflected in calibration chart, and this calibration chart is presented in the display interface of this power tong head torque check system,

universal power tong factory

Automated hydraulic tong GKSh-12000 "Yurmaty" is designed for fast, safe making up and breaking out of drill pipes with rated sizes from Ø89 mm (3 1/2") to Ø254 mm (10") and controlled by an industrial PC controller with a real-time operating system Windows CE 7.0.

The Tong is mounted on the regular place of drilling tong AKB. Changing of the design of the drilling platform and procedure for approval are not required;

universal power tong factory

Matherne Instrumentation’s power tong system is designed to assure uniform and proper make-up of the string by indicating accurate torque applied to each joint when running pipe or casing.

The system can help reduce drill collar and tool joint failure resulting from improper make-up. The system includes a 6” tong torque indicator with bracket, a standard 5 ft. hose, and a tension or compression load cell.

The convenient mounting design allows the gauge to be mounted in a driller’s console, in a weight indicator box, locally on the power tong, or stand alone. The 6” dial face is available with combination dual scales for added versatility.

universal power tong factory

Moon did not originally intend on founding a separate organization or denomination,Segye Gidoggyo Tong-il Seonglyeong Hyeobhoe), until 1954.Korean: 통일교; RR: Tong-il-gyo) has been commonly used by members, the public, and the news media.

In 1998, Unification movement-related businesses launched operations in North Korea with the approval of the government of South Korea, which had prohibited business relationships between North and South before.Tongil Group founded Pyeonghwa Motors in the North Korean port of Nampo, in cooperation with the North Korean government. It was the first automobile factory in North Korea.

Unification theology teaches that Jesus came to establish the kingdom of Heaven on Earth. As St. Paul wrote, Jesus was to be the new Adam restoring the lost garden of Eden. For this purpose he chose twelve apostles, symbolizing the original twelve tribes of Israel, and sent out seventy disciples, symbolizing all the nations of the world. Like John the Baptist, Jesus proclaimed that the long-awaited kingdom of heaven was at hand (Matt. 4:17). Jesus was appointed God"s earthly representative in order to subjugate Satan, cleanse men of original sin and free them from the power of evil. Christ"s mission involved liberation from sin and raising mankind to the perfection stage. His purpose was to bring about the kingdom of heaven in our world with the help of men filled with divine truth and love. Jesus" goal was to restore the garden of Eden, a place of joy and beauty in which true families of perfected parents would dwell with God in a full relationship of reciprocal love.

Universal Peace Federation (UPF) is an international and interreligious civil society organization that was founded in 2005 which promotes religious freedom.Dialogue and Alliance is its journal published from Tarrytown, New York.United Nations projects, especially in the field of peace education, family and peace building.

The Universal Ballet, founded South Korea in 1984, is one of only four professional ballet companies in South Korea. The company performs a repertory that includes many full length classical story ballets, together with shorter contemporary works and original full-length Korean ballets created especially for the company. It is supported by UC members with Moon"s daughter-in-law Julia Moon, who was the company"s prima ballerina until 2001, now serving as General Director.

Podgorica club was founded at the beginning of 2019 in Podgorica, Montenegro. Members of the Podgorica club are former presidents and prime ministers of the countries of the Balkan region, such as former Montenegrin president Vujanovic, former Bosnian prime minister Lagumdja, former Slovenian president Turk, former Croatian president Mesic, former Serbian president Micic, former Albanian president Moisiu and other prominent politicians from the Balkans area. The founding of the Podgorica Club followed the world summits in South Korea, organized by the Universal Peace Federation, which were attended by politicians from the Balkans, such as former President Vujanovic and former Albanian President Moisiu.

In South Korea the Tongil Group was founded in 1963 by Sun Myung Moon as a nonprofit organization which would provide revenue for the movement. Its core focus was manufacturing but in the 1970s and 1980s it expanded by founding or acquiring businesses in pharmaceuticals, tourism, and publishing.1997 Asian Financial Crisis. By 2004 it was losing money and was $3.6 billion in debt. In 2005 Sun Myung Moon"s son, Kook-jin Moon was appointed chairman of Tongil Group.ginseng and related products; Ilshin Stone, building materials; and Tongil Heavy Industries, machine parts including hardware for the South Korean military. The Tongil Group funds the Tongil Foundation which supports Unification movement projects including schools and the Little Angels Children"s Folk Ballet of Korea.

Geneva Interfaith and Intercultural Alliance, a Swiss association founded in 2008 under the patronage of the UN Mission of the Republic of the Philippines and the UN Mission of the Republic of Indonesia, and the Universal Peace Federation, offering programmes and intercultural training for diplomats, based on the Universal Peace Federation Ambassador for peace curriculum.

The Power of the Principle: When It Came; Where It Went Richard Quebedeaux, "Rev. Moon calls such a mode of living, such a lifestyle, "restoration through indemnity." With indemnity viewed as a persistent pattern of behavior, not as a mere doctrine to be affirmed or a rational list of rules, God"s ideal for human relationships is "restored" through restitution. Restitution-in the sense of a "natural law"-assuages resentment, because it is the means by which the powerful and enfranchised give the people who feel downtrodden and powerless what they believe is rightly theirs. Indemnity means that "I"m here for you.""

My Four and One Half Years with The Lord of The Flies Archived 2018-07-18 at the Wayback Machine, Allen Tate Wood "From March to December of 1970 I was head of the Unification Church"s political arm in the United States (The Freedom Leadership Foundation). On Moon"s behalf we sought to defuse the Peace Movement and buttress the hawk position by convincing senators and congressmen that there was substantial grass roots support for a hard line stand in Asia. In 1969 we were just scratching the surface. Today Moon"s organization is in a position of vastly increased power and prestige. Through the Freedom Leadership Foundation and its descendant CAUSA, Moon has won the gratitude and respect of many congressmen and senators, not to mention former presidents Nixon, Reagan and Bush."