workover rig diagram free sample
Download Workover & Drilling Rig Inspection Checklist As we mentioned in the Rig Audit Article, rig inspection is an important process that shall be done from time to time. Especially, after the rig moving to a new drilling location.
This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.
Workover-Office-completion-graphics-and-calculations includes an easy start with 17 of the most common well completions, plus Cement Plugs, Xtree schematic, Liners, Tie Backs, Packer Calculations, Field Testing Production Rates, Tubing Movement Calculations, Rod Pump Completions, Operator Report, 20 item GLM spacing, operators report and field reports plus Final Well Completion Report.
Workover-Office-completion-graphics-and-calculations includes an extended library of over 1000 hi-resolution workover and completion graphics completely automated on button clicks instead of drag and drop to give you a first class professional finish to your Wellbore schematics. Your final well report can be exported to your well file with a simple click as a single linked Excel worksheet, or emailed directly to the client
Workover-Office-completion-graphics-and-calculations, now includes the layout for a Frac Manifold iron library added to the program, complete with straights, 90° bends, tees, valves, pressure shut down valves, the complete package for a professional graphic output
Did you know that 90% of people present at a presentation would rather listen than read? Therefore you have to create powerful presentations using few words and that?s what professionally designed Drilling Rig Of Oil And Gas do.
Presenting this set of slides with name - Drilling Rig Of Oil And Gas. This is a four stage process. The stages in this process are Oil And Gas, Petroleum Icon, Fuel.
Gas and oil companies have always been the most successful businesses in the world. If you are running an oil company, then this template is the right fit for you. This slide provides top of the line vector images of an oil and gas refinery that can help you explain the fundamental process of import and the export of crude oil with ease. Apart from this, you can also utilize this template to present some facts and figures in front of your stakeholders, thus showing the overall positioning and profits of your organization.
Use this Oil and Gas Rig extraction PPT template to create professional presentations effortlessly. With various editable layouts and design elements, this template will prove to be a great choice for anybody designing presentations related to subsoil, rig, pie, petroleum, extraction of oil and similar other topics. You can easily download this template and enhance your overall productivity with it.
Offshore structures are used across the globe for a variety of functions and water depths. Present a general overview of all the aspects of offshore drilling including right planning, transportation, fabrication, installation, commissioning of petroleum platforms and others using this fully resourceful template. You can also explain the basic fundamentals of the types of offshore structures, with this editable layout.
Use this template to discuss the three primary types of offshore oil rigs. This template can also be useful to show the locations of various oil rigs and their mechanism to your workforce. Since, offshore drilling poses a lot of environmental challenges, you can use this template to present an overview of all of them to create awareness. This is a very intuitively designed template, so you can alter all its elements to make it fit your business.
Use this template to introduce upstream and downstream offshore drilling facilities like exploration, appraisal, development, and others. This PPT slide can be used to explain the complex structure of an oil rig and its subtypes depending upon the needs of the user. It also comes in an editable format, so you can make changes as and when necessary to suit your personal needs.
Showcase the process of exploring, extracting, storing and processing petroleum with this oil rig PPT template. Present an overview of the offshore drilling challenges and their impact on the environment by employing this fully editable slide. You can either use this PPT layout in conjunction with your business and academic presentations or present it as it is depending upon your needs.
This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.
Rig means the vessel described in Recital (A) hereto and includes any share or interest therein and her engines, machinery, boats, tackle, outfit, spare gear, fuel, consumable or other stores, belongings and appurtenances whether on board or ashore and whether now owned or hereafter acquired (but excluding therefrom any leased equipment owned by third parties);
LEASE AND WELL NO. TD PBTD PACKER AFE # Gemini Unit #1 10,380 None NonePRESENT OPERATION PERFS W. O. FLUID AFE $ Go in Hole with Slickline 10228 - 10238 10300 - 10328 Field Salt WaterCONTRACTOR & RIG NO. CASING TUBING Select Oilfield Service None 2-7/8" 6.5#TREE CONNECTIONS
FROM TO HRS OPERATIONS IN SEQUENCE INTANGIBLES DAILY CUM 800 1800 10 Coordinate slickline equipment, travel to Beaumont, Texas. Permits, Survey 0 Rig Mobilization 0 Rig 0 Location / Roads / Dredging 0 Location Damages 0 Drilling / Completion Fluids 0 Drill Bits / Reamers / Stabilizer 0 Cementing / Accessories 0 Logging / Wellsite Geology Mudlog 0 Fuel / Power / Water 0 Swabbing / Wireline Services 0 Nitrogen / Coil Tubing 0 Cased Hole Electric Line 0 Equipment Rental 0 Testing / Coring 0 Closed Loop & Disposal 0 Flitration Systems 0 Fishing 0 Casing Crew / Laydown Equipment 0 Frac / Simulation 0 Squeeze & Cement 0 Miscellaneous Contract Labor 0 Materials & Supplies 0 Transportation 0 Docking Services 0 Diving Services 0 Communication 0 Engineering Services 0 Supervision 1,000 1,000 Insurance 0 Plugging & Abandonment 0 Contingencies 0 TOTAL INTANGIBLES 1,000 1,000
LEASE AND WELL NO. TD PBTD PACKER AFE # Gemini Unit #1 10,380 None NonePRESENT OPERATION PERFS W. O. FLUID AFE $ Go in Hole with Slickline 10228 - 10238 10300 - 10328 Field Salt WaterCONTRACTOR & RIG NO. CASING TUBING Select Oilfield Service None 2-7/8" 6.5#TREE CONNECTIONS 0
FROM TO HRS OPERATIONS IN SEQUENCE INTANGIBLES DAILY CUM 800 900 1 Safety meeting, RU slickline. Permits, Survey 0 Rig Mobilization 0 900 1100 2 GIH with 1-3/4" bailer, run #1, tagged solid at 9616 ft., work bailer from 9616 ft. to Rig 0 9634 ft. ( 18 ft. ) POH, recovered 1 - cup thick gray liquid, 2 - tablespoons sand Location / Roads / Dredging 0 Location Damages 0 1100 1300 2 GIH with 1-3/4" bailer, run #2, tagged at 9634 ft., work bailer to 9654 ft. ( 20 ft. ) Drilling / Completion Fluids 0 POH, recovered 1 - cup of sand, 1/4 - cup gray liquid Drill Bits / Reamers / Stabilizer 0 Cementing / Accessories 0 1300 1430 1.5 GIH with 1-3/4" bailer, run #3, tagged at 9725 ft., work bailer, made no hole, Logging / Wellsite Geology Mudl 0 POH, recovered 1 - cup of sand, 1/4 - cup gray liquid Fuel / Power / Water 0 Swabbing / Wireline Services 3,762 3,762 1430 1630 2 GIH with 1-3/4" bailer, run #4, tagged at 9725 ft., work bailer, did not make any hole, Nitrogen / Coil Tubing 0 POH, recovered 1/4 - cup sand, 1/4 - cup gray liquid Cased Hole Electric Line 0 Equipment Rental 0 1630 1700 0.5 Rig down slickline, SDFN Testing / Coring 0 Closed Loop & Disposal 0 Flitration Systems 0 Fishing 0 Casing Crew / Laydown Equipme 0 Frac / Simulation 0 Squeeze & Cement 0 Miscellaneous Contract Labor 0 Materials & Supplies 0 Transportation 0 Docking Services 0 Diving Services 0 Communication 0 Engineering Services 0 Supervision 1,000 2,000 Insurance 0 Plugging & Abandonment 0 Contingencies 0 TOTAL INTANGIBLES 4,762 5,762
LEASE AND WELL NO. TD PBTD PACKER AFE # Gemini Unit #1 10,380 None NonePRESENT OPERATION PERFS W. O. FLUID AFE $ Go in Hole with Slickline 10228 - 10238 10300 - 10328 Field Salt WaterCONTRACTOR & RIG NO. CASING TUBING Select Oilfield Service None 2-7/8" 6.5#TREE CONNECTIONS 0
FROM TO HRS OPERATIONS IN SEQUENCE INTANGIBLES DAILY CUM 800 900 1 Safety meeting, RU slickline Permits, Survey 0 Rig Mobilization 0 900 1100 2 GIH with 1-3/4" bailer run #1, tagged at 9750 ft. Work bailer to 9760 ft. POH, Rig 0 recovered 1/4 cup sand, 1/4 cup of gray liquid Location / Roads / Dredging 0 Location Damages 0 1100 1300 2 GIH with 1-3/4" bailer run #2, tagged at 9760 ft. Work bailer to 9775 ft., POH, Drilling / Completion Fluids 0 recovered 1/4 cup sand, 1/4 cup of gray liquid Drill Bits / Reamers / Stabilizer 0 Cementing / Accessories 0 1300 1500 2 GIH with 1-3/4" bailer run #3, tagged at 9780 ft. Work bailer to 9835 ft., POH, Logging / Wellsite Geology Mudl 0 recovered 1/4 cup sand, 1/4 cup of gray liquid Fuel / Power / Water 0 Swabbing / Wireline Services 2,000 5,762 1500 1700 2 GIH with 1-3/4" bailer run #4, tagged at 9835 ft. Work bailer, did not make any hole, Nitrogen / Coil Tubing 0 POH, recovered 2 tablespoon sand Cased Hole Electric Line 0 Equipment Rental 0 1700 1730 0.5 Shut well in till a.m., RD slickline. Testing / Coring 0 Closed Loop & Disposal 0 Flitration Systems 0 Fishing 0 Casing Crew / Laydown Equipme 0 Frac / Simulation 0 Squeeze & Cement 0 Miscellaneous Contract Labor 0 Materials & Supplies 0 Transportation 0 Docking Services 0 Diving Services 0 Communication 0 Engineering Services 0 Supervision 1,000 3,000 Insurance 0 Plugging & Abandonment 0 Contingencies 0 TOTAL INTANGIBLES 3,000 8,762
LEASE AND WELL NO. TD PBTD PACKER AFE # Gemini Unit #1 10,380 None NonePRESENT OPERATION PERFS W. O. FLUID AFE $ Final Report 10228 - 10238 10300 - 10328 Field Salt WaterCONTRACTOR & RIG NO. CASING TUBING Select Oilfield Service None 2-7/8" 6.5#TREE CONNECTIONS 0
FROM TO HRS OPERATIONS IN SEQUENCE INTANGIBLES DAILY CUM 700 800 1 Safety meeting, RU slickline Permits, Survey 0 Rig Mobilization 0 800 1030 2.5 GIH with 1-3/4" bailer run #1, tagged at 9835 ft. Work bailer, did not make hole, Rig 0 POH, no recovery, shut in well, RD and move out slickline. Final report Location / Roads / Dredging 0 Location Damages 0 Drilling / Completion Fluids 0 Drill Bits / Reamers / Stabilizer 0 Cementing / Accessories 0 Logging / Wellsite Geology Mudl 0 Fuel / Power / Water 0 Swabbing / Wireline Services 2,000 7,762 Nitrogen / Coil Tubing 0 Cased Hole Electric Line 0 Equipment Rental 0 Testing / Coring 0 Closed Loop & Disposal 0 Flitration Systems 0 Fishing 0 Casing Crew / Laydown Equipme 0 Frac / Simulation 0 Squeeze & Cement 0 Miscellaneous Contract Labor 0 Materials & Supplies 0 Transportation 0 Docking Services 0 Diving Services 0 Communication 0 Engineering Services 0 Supervision 1,000 4,000 Insurance 0 Plugging & Abandonment 0 Contingencies 0 TOTAL INTANGIBLES 3,000 11,762
LEASE AND WELL NO. TD PBTD PACKER AFE # Gemini Unit #1 10,380 None NonePRESENT OPERATION PERFS W. O. FLUID AFE $ Go in Hole with Slickline 10228 - 10238 10300 - 10328 Field Salt WaterCONTRACTOR & RIG NO. CASING TUBING Select Oilfield Service None 2-7/8" 6.5#TREE CONNECTIONS 0
FROM TO HRS OPERATIONS IN SEQUENCE INTANGIBLES DAILY CUM Permits, Survey 0 Rig Mobilization 0 Rig 0 Location / Roads / Dredging 0 Location Damages 0 Drilling / Completion Fluids 0 Drill Bits / Reamers / Stabilizer 0 Cementing / Accessories 0 Logging / Wellsite Geology Mudl 0 Fuel / Power / Water 0 Swabbing / Wireline Services 7,762 Nitrogen / Coil Tubing 0 Cased Hole Electric Line 0 Equipment Rental 0 Testing / Coring 0 Closed Loop & Disposal 0 Flitration Systems 0 Fishing 0 Casing Crew / Laydown Equipme 0 Frac / Simulation 0 Squeeze & Cement 0 Miscellaneous Contract Labor 0 Materials & Supplies 0 Transportation 0 Docking Services 0 Diving Services 0 Communication 0 Engineering Services 0 Supervision 4,000 Insurance 0 Plugging & Abandonment 0 Contingencies 0 TOTAL INTANGIBLES 0 11,762
LEASE AND WELL NO. TD PBTD PACKER AFE # Gemini Unit #1 10,380 None NonePRESENT OPERATION PERFS W. O. FLUID AFE $ Go in Hole with Slickline 10228 - 10238 10300 - 10328 Field Salt WaterCONTRACTOR & RIG NO. CASING TUBING Select Oilfield Service None 2-7/8" 6.5#TREE CONNECTIONS 0
FROM TO HRS OPERATIONS IN SEQUENCE INTANGIBLES DAILY CUM Permits, Survey 0 Rig Mobilization 0 Rig 0 Location / Roads / Dredging 0 Location Damages 0 Drilling / Completion Fluids 0 Drill Bits / Reamers / Stabilizer 0 Cementing / Accessories 0 Logging / Wellsite Geology Mudl 0 Fuel / Power / Water 0 Swabbing / Wireline Services 7,762 Nitrogen / Coil Tubing 0 Cased Hole Electric Line 0 Equipment Rental 0 Testing / Coring 0 Closed Loop & Disposal 0 Flitration Systems 0 Fishing 0 Casing Crew / Laydown Equipme 0 Frac / Simulation 0 Squeeze & Cement 0 Miscellaneous Contract Labor 0 Materials & Supplies 0 Transportation 0 Docking Services 0 Diving Services 0 Communication 0 Engineering Services 0 Supervision 4,000 Insurance 0 Plugging & Abandonment 0 Contingencies 0 TOTAL INTANGIBLES 0 11,762
LEASE AND WELL NO. TD PBTD PACKER AFE # Gemini Unit #1 10,380 None NonePRESENT OPERATION PERFS W. O. FLUID AFE $ Go in Hole with Slickline 10228 - 10238 10300 - 10328 Field Salt WaterCONTRACTOR & RIG NO. CASING TUBING Select Oilfield Service None 2-7/8" 6.5#TREE CONNECTIONS 0
FROM TO HRS OPERATIONS IN SEQUENCE INTANGIBLES DAILY CUM Permits, Survey 0 Rig Mobilization 0 Rig 0 Location / Roads / Dredging 0 Location Damages 0 Drilling / Completion Fluids 0 Drill Bits / Reamers / Stabilizer 0 Cementing / Accessories 0 Logging / Wellsite Geology Mudl 0 Fuel / Power / Water 0 Swabbing / Wireline Services 7,762 Nitrogen / Coil Tubing 0 Cased Hole Electric Line 0 Equipment Rental 0 Testing / Coring 0 Closed Loop & Disposal 0 Flitration Systems 0 Fishing 0 Casing Crew / Laydown Equipme 0 Frac / Simulation 0 Squeeze & Cement 0 Miscellaneous Contract Labor 0 Materials & Supplies 0 Transportation 0 Docking Services 0 Diving Services 0 Communication 0 Engineering Services 0 Supervision 4,000 Insurance 0 Plugging & Abandonment 0 Contingencies 0 TOTAL INTANGIBLES 0 11,762
CONTRACTOR & RIG NO. CASING TUBING None 2-7/8" 6.5#TREE CONNECTIONS 0
FROM TO HRS OPERATIONS IN SEQUENCE INTANGIBLES DAILY CUM Permits, Survey 0 Rig Mobilization 0 Rig 0 Location / Roads / Dredging 0 Location Damages 0 Drilling / Completion Fluids 0 Drill Bits / Reamers / Stabilizer 0 Cementing / Accessories 0 Logging / Wellsite Geology Mudl 0 Fuel / Power / Water 0 Swabbing / Wireline Services 7,762 Nitrogen / Coil Tubing 0 Cased Hole Electric Line 0 Equipment Rental 0 Testing / Coring 0 Closed Loop & Disposal 0 Flitration Systems 0 Fishing 0 Casing Crew / Laydown Equipme 0 Frac / Simulation 0 Squeeze & Cement 0 Miscellaneous Contract Labor 0 Materials & Supplies 0 Transportation 0 Docking Services 0 Diving Services 0 Communication 0 Engineering Services 0 Supervision 4,000 Insurance 0 Plugging & Abandonment 0 Contingencies 0 TOTAL INTANGIBLES 0 11,762
LEASE AND WELL NO. TD PBTD PACKER AFE # Gemini Unit #1 0 0 0PRESENT OPERATION PERFS W. O. FLUID AFE $ Go in Hole with Slickline 0 0CONTRACTOR & RIG NO. CASING TUBING Select Oilfield Service None 2-7/8" 6.5#TREE CONNECTIONS 0
FROM TO HRS OPERATIONS IN SEQUENCE INTANGIBLES DAILY CUM Permits, Survey 0 Rig Mobilization 0 Rig 0 Location / Roads / Dredging 0 Location Damages 0 Drilling / Completion Fluids 0 Drill Bits / Reamers / Stabilizer 0 Cementing / Accessories 0 Logging / Wellsite Geology Mudl 0 Fuel / Power / Water 0 Swabbing / Wireline Services 7,762 Nitrogen / Coil Tubing 0 Cased Hole Electric Line 0 Equipment Rental 0 Testing / Coring 0 Closed Loop & Disposal 0 Flitration Systems 0 Fishing 0 Casing Crew / Laydown Equipme 0 Frac / Simulation 0 Squeeze & Cement 0 Miscellaneous Contract Labor 0 Materials & Supplies 0 Transportation 0 Docking Services 0 Diving Services 0 Communication 0 Engineering Services 0 Supervision 4,000 Insurance 0 Plugging & Abandonment 0 Contingencies 0 TOTAL INTANGIBLES 0 11,762
LEASE AND WELL NO. TD PBTD PACKER AFE # Gemini Unit #1 0 0 0PRESENT OPERATION PERFS W. O. FLUID AFE $ Go in Hole with Slickline 0 0CONTRACTOR & RIG NO. CASING TUBING Select Oilfield Service None